排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
HIRFL-CSR complex 总被引:2,自引:0,他引:2
夏佳文 詹文龙 魏宝文 原有进 袁平 乔为民 高大庆 杨晓天 满开第 肖国青 赵红卫 杨晓东 蔡晓红 宋明涛 徐瑚珊 马力祯 刘勇 何源 周忠祖 张玮 许哲 毛瑞士 张军辉 敬岚 杨雅清 杨建成 冒立军 陈又新 《中国物理 C》2009,33(9):804-810
The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm. 相似文献
1