首页 | 本学科首页   官方微博 | 高级检索  
     检索      

HIRFL-CSR complex
作者姓名:夏佳文  詹文龙  魏宝文  原有进  袁平  乔为民  高大庆  杨晓天  满开第  肖国青  赵红卫  杨晓东  蔡晓红  宋明涛  徐瑚珊  马力祯  刘勇  何源  周忠祖  张玮  许哲  毛瑞士  张军辉  敬岚  杨雅清  杨建成  冒立军  陈又新
作者单位:Institute of Modern Physics, Chinese Academy of Sciences, P.O. Box 31, Lanzhou 730000, China
基金项目:Supported by National Natural Science Foundation of China (10635090)
摘    要:The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm.

关 键 词:社会责任  冷却储存  兰州重离子加速器  超高真空系统  电子冷却  上升时间  空心电子束  人机界面
收稿时间:2008-11-28
修稿时间:2009-1-21

HIRFL-CSR complex
XIA Jia-Wen ZHAN Wen-Long WEI Bao-Wen YUAN You-Jin YUAN Ping QIAO Wei-MinGAO Da-Qing YANG Xiao-Tian MAN Kai-Di XIAO Guo-QingZHAO Hong-Wei YANG Xiao-Dong CAI Xiao-HongSONG Ming-Tao XU Hu-Shan MA Li-Zhen LIU Yong HE Yuan ZHOU Zhong-Zu ZHANG Wei XU Zhe MAO Rui-Shi ZHANG Jun-Hui JING Lan YANG Ya-Qing YANG Jian-Cheng MAO Li-Jun CHEN You-Xin.HIRFL-CSR complex[J].High Energy Physics and Nuclear Physics,2009,33(9):804-810.
Authors:XIA Jia-Wen ZHAN Wen-Long WEI Bao-Wen YUAN You-Jin YUAN Ping QIAO Wei-MinGAO Da-Qing YANG Xiao-Tian MAN Kai-Di XIAO Guo-QingZHAO Hong-Wei YANG Xiao-Dong CAI Xiao-HongSONG Ming-Tao XU Hu-Shan MA Li-Zhen LIU Yong HE Yuan ZHOU Zhong-Zu ZHANG Wei XU Zhe MAO Rui-Shi ZHANG Jun-Hui JING Lan YANG Ya-Qing YANG Jian-Cheng MAO Li-Jun CHEN You-Xin
Institution:Institute of Modern Physics;Chinese Academy of Sciences;P.O. Box 31;Lanzhou 730000;China
Abstract:The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or ...
Keywords:CSR  commissioning  heavy ion  e-cooling  accumulation  
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《中国物理 C》浏览原始摘要信息
点击此处可从《中国物理 C》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号