共查询到20条相似文献,搜索用时 78 毫秒
1.
2.
3.
4.
5.
6.
7.
8.
北京正负电子对撞机重大改造工程BEPCⅡ于2001年启动. BEPCⅡ采用双环交叉角对撞方案,使用微包络函数(micro-β)和多束团对撞以提高亮度. 先进的低温超导技术将用于对撞机的设计中. BEPCⅡ控制系统采用分布式体系结构和系统集成工具EPICS(Experimental Physics and Industrial Control System)进行开发. 控制系统的设计采用了国际先进技术. 目前系统正在建造之中, 主要系统完成了软硬件开发和实验室调试, 于2006年3月进入现场安装.预计BEPCⅡ储存环2006年10月可以开始带束流调试. 本文将介绍BEPCⅡ控制系统及其进展. 相似文献
9.
基于隧道二极管单稳态电路、高速可重触发电路、ECL技术等多种高速电路技术设计了BEPCⅡ束团缺口信号提取电路。介绍了BEPCⅡ储存环中带缺口的多束团运行模式。对Pickup电极感应信号经过长电缆传输衰减后的波形进行了研究。分析了缺口提取电路中处理快速信号的隧道二极管单稳态电路原理,该电路可以将0.3 ns的正脉冲展宽到4 ns的ECL电平脉冲。给出了标准束团注入和非标准注入情况下束团缺口判定逻辑。测试结果表明:此电路对各种束团注入情况均能正常工作,且提取出的同步信号均方根抖动值仅为80.49 ps,满足设计要求。 相似文献
10.
11.
In order to cure the transverse coupled-bunch instabilities of BEPCⅡ and improve the beam current of the rings, a prototype of transverse bunch-by-bunch feedback system was studied and made. The experiment of this prototype on the BEPC storage ring shows that this system can work well. The beam instabilities can be successfully suppressed when the feedback loop is closed. This paper describes the prototype of the transverse feedback system and the preliminary test results. 相似文献
12.
13.
BEPCII是一个多束团、大流强的装置, 由于高频腔的高次模和电阻壁阻抗等因素,不可避免地会出现束流不稳定性。BEPCII中采用束流反馈系统来抑制束流不稳定性。横向束流反馈系统主要包括前端电子学、信号处理电子学、反馈器件和放大器等几个部分。梳状滤波器是信号处理电子学的重要部件,利用两根长短不同的电缆以及一个功分器和合成器构成了一种简单有效的梳状滤波器,其梳状深度达到-41 dB,使用这种梳状滤波器的横向反馈系统成功地抑制了束流中出现的不稳定性。 相似文献
14.
V. M. Zhabitsky 《Physics of Particles and Nuclei Letters》2010,7(7):450-453
The stability of an ion beam in synchrotrons with digital filters in the feedback loop of a transverse damper is treated.
A transverse feedback system (TFS) is required in synchrotrons to stabilize the high intensity ion beams against transverse
instabilities and to damp the beam injection errors. The TFS damper kicker (DK) corrects the transverse momentum of a bunch
in proportion to its displacement from the closed orbit at the location of the beam position monitor (BPM). The digital signal
processing unit in the feedback loop between BPM and DK ensures a condition to achieve optimal damping. Damping rates of the
feedback systems with digital filters are analysed in comparison with those in an ideal feedback system. 相似文献
15.
Electron Cloud Instability has been studied in the operation of BEPC. The BEPCⅡ began the commissioning in November 2006 and the positron beam current has reached 500 mA. Because of such a high beam current, some instabilities such as ECI, bunch lengthening et al, have appeared during the operation. The experimental investigation on ECI during the commissioning of BEPCⅡ will be reported in this paper. 相似文献
16.
用高频结构模拟程序HFSS优化设计条带电极kicker并计算了它的反射参数和横向分流阻抗。从模拟得到的反射参数可以看出,在要求的250MHz带宽范围内, 反射的功率小于7%,说明了条带与功率传输线是阻抗匹配的;模拟得到的横向分流阻抗与公式计算得到的结果基本上一致。当频率250MHz时,得到了1 300Ω的分流阻抗,在此种条件下,需要反馈功率为123W方能抑制束流不稳定性,这为电极的机械设计和在反馈系统中选择功率放大器提供了最基本的依据。 相似文献
17.
18.
BEPC Ⅱ,the upgrade project of Beijing Electron Positron Collider (BEPC),is an accelerator with large beam current and high luminosity,so an efficient and stable injector is required.Several beam diagnostic and monitoring instruments are used.A new diagnostic instrument--wire scanner,has been designed and will be used to nleasure the profile of the linac beam of BEPC Ⅱ.This paper describes the prototype of this system and the cause of heat generating of the wire.Some simulation results of the heat and force by using finite element method software-ANSYS(R),2) are presented and discussed. 相似文献
19.
选择了一台商业化的前端电子学RFTF(radio frequency front-end for transverse feedback system)用于BEPCII横向束流反馈系统, 这是跟进世界先进加速器技术的具体实施。在BEPC同步运行模式下对RFTF的性能进行了测试实验,结果表明使用RFTF可以得到理想的波形,能够满足BEPCII横向反馈系统的需要,但是,当储存环出现不稳性时,系统无法正常工作,这就要求BEPCII纵向不稳定很小或者用纵向反馈系统来抑制存在的纵向不稳定。 相似文献
20.
介绍了在合肥光源开展逐束团测量(横向和纵向)和横向束流反馈系统研究和研制的重要性,同时还介绍了设计思想。合肥光源高频频率为204 MHz,因此,系统至少需要100 MHz的带宽。还较详细地介绍了宽带部件和系统参数的选择原则。该系统不仅可用于研究由于高频腔中的高阶模和真空室的阻抗壁效应所引起的耦合束团不稳定性,而且还能抑制耦合束团不稳定性振荡、快速束流离子不稳定性和注入大幅度振荡等,从而将提高机器的运行性能。 相似文献