首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
数学   4篇
  2021年   1篇
  2020年   1篇
  2015年   1篇
  2012年   1篇
排序方式: 共有4条查询结果,搜索用时 0 毫秒
1
1.
2.
In this paper we analyze the procurement problem of a company that needs to purchase a number of products from a set of suppliers to satisfy demand. The suppliers offer total quantity discounts and the company aims at selecting a set of suppliers so to satisfy product demand at minimum purchasing cost. The problem, known as Total Quantity Discount Problem (TQDP), is strongly NP-hard. We study different families of valid inequalities and provide a branch-and-cut approach to solve the capacitated variant of the problem (Capacitated TQDP) where the quantity available for a product from a supplier is limited. A hybrid algorithm, called HELP (Heuristic Enhancement from LP), is used to provide an initial feasible solution to the exact approach. HELP exploits information provided by the continuous relaxation problem to construct neighborhoods optimally searched through the solution of mixed integer subproblems. A streamlined version of the proposed exact method can optimally solve in a reasonable amount of time instances with up to 100 suppliers and 500 products, and largely outperforms an existing approach available in the literature and CPLEX 12.2 that frequently runs out of memory before completing the search.  相似文献   
3.

In this work, we study a stochastic single machine scheduling problem in which the features of learning effect on processing times, sequence-dependent setup times, and machine configuration selection are considered simultaneously. More precisely, the machine works under a set of configurations and requires stochastic sequence-dependent setup times to switch from one configuration to another. Also, the stochastic processing time of a job is a function of its position and the machine configuration. The objective is to find the sequence of jobs and choose a configuration to process each job to minimize the makespan. We first show that the proposed problem can be formulated through two-stage and multi-stage Stochastic Programming models, which are challenging from the computational point of view. Then, by looking at the problem as a multi-stage dynamic random decision process, a new deterministic approximation-based formulation is developed. The method first derives a mixed-integer non-linear model based on the concept of accessibility to all possible and available alternatives at each stage of the decision-making process. Then, to efficiently solve the problem, a new accessibility measure is defined to convert the model into the search of a shortest path throughout the stages. Extensive computational experiments are carried out on various sets of instances. We discuss and compare the results found by the resolution of plain stochastic models with those obtained by the deterministic approximation approach. Our approximation shows excellent performances both in terms of solution accuracy and computational time.

  相似文献   
4.
We consider a decision maker who performs a stochastic decision process over a multiple number of stages, where the choice alternatives are characterized b  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号