首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   15篇
  免费   2篇
数学   17篇
  2018年   1篇
  2017年   2篇
  2014年   1篇
  2010年   1篇
  2009年   2篇
  2008年   1篇
  2007年   3篇
  2006年   1篇
  2005年   1篇
  2003年   1篇
  2000年   1篇
  1999年   1篇
  1995年   1篇
排序方式: 共有17条查询结果,搜索用时 15 毫秒
1.
Second order mixed type dual is introduced for multiobjective programming problems. Results about weak duality, strong duality, and strict converse duality are established under generalized second order (F,ρ)-convexity assumptions. These results generalize the duality results recently given by Aghezzaf and Hachimi involving generalized first order (F,ρ)-convexity conditions.  相似文献   
2.
Second-Order Optimality Conditions in Multiobjective Optimization Problems   总被引:3,自引:0,他引:3  
In this paper, we develop second-order necessary and sufficient optimality conditions for multiobjective optimization problems with both equality and inequality constraints. First, we generalize the Lin fundamental theorem (Ref. 1) to second-order tangent sets; then, based on the above generalized theorem, we derive second-order necessary and sufficient conditions for efficiency.  相似文献   
3.
Given a treeG = (V, E) and a weight function defined on subsets of its nodes, we consider two associated problems. The first, called the rooted subtree problem, is to find a maximum weight subtree, with a specified root, from a given set of subtrees.The second problem, called the subtree packing problem, is to find a maximum weight packing of node disjoint subtrees chosen from a given set of subtrees, where the value of each subtree may depend on its root.We show that the complexity status of both problems is related, and that the subtree packing problem is polynomial if and only if each rooted subtree problem is polynomial. In addition we show that the convex hulls of the feasible solutions to both problems are related: the convex hull of solutions to the packing problem is given by pasting together the convex hulls of the rooted subtree problems.We examine in detail the case where the set of feasible subtrees rooted at nodei consists of all subtrees with at mostk nodes. For this case we derive valid inequalities, and specify the convex hull whenk 4.Research supported in part by Nato Collaborative Research Grant CRG 900281, Science Program SC1-CT91-620 of the EEC, and contract No 26 of the programme Pôle d'attraction interuniversitaire of the Belgian government.  相似文献   
4.
Vendor managed inventory (VMI) is an example of effective cooperation and partnering practices between up- and downstream stages in a supply chain. In VMI, the supplier takes the responsibility for replenishing his customers’ inventories based on their consumption data, with the aim of optimizing the over all distribution and inventory costs throughout the supply chain. This paper discusses the challenging optimization problem that arises in this context, known as the inventory routing problem (IRP). The objective of this IRP problem is to determine a distribution plan that minimizes average distribution and inventory costs without causing any stock-out at the customers. Deterministic constant customer demand rates are assumed and therefore, a long-term cyclical approach is adopted, integrating fleet sizing, vehicle routing, and inventory management. Further, realistic side-constraints such as limited storage capacities, driving time restrictions and constant replenishment intervals are taken into account. A heuristic solution approach is proposed, analyzed and evaluated against a comparable state-of-the-art heuristic.  相似文献   
5.
We are given a set of items that must be produced in lots on a capacitated production system throughout a specified finite planning horizon. We assume that the production system is subject to random failures, and that any maintenance action carried out on the system, in a period, reduces the system’s available production capacity during that period. The objective is to find an integrated lot-sizing and preventive maintenance strategy of the system that satisfies the demand for all items over the entire horizon without backlogging, and which minimizes the expected sum of production and maintenance costs. We show how this problem can be formulated and solved as a multi-item capacitated lot-sizing problem on a system that is periodically renewed and minimally repaired at failure. We also provide an illustrative example that shows the steps to obtain an optimal integrated production and maintenance strategy.  相似文献   
6.
We discuss the strategic capacity planning and warehouse location problem in supply chains operating under uncertainty. In particular, we consider situations in which demand variability is the only source of uncertainty. We first propose a deterministic model for the problem when all relevant parameters are known with certainty, and discuss related tractability and computational issues. We then present a robust optimization model for the problem when the demand is uncertain, and demonstrate how robust solutions may be determined with an efficient decomposition algorithm using a special Lagrangian relaxation method in which the multipliers are constructed from dual variables of a linear program.  相似文献   
7.
The inherent uncertainty in supply chain systems compels managers to be more perceptive to the stochastic nature of the systems' major parameters, such as suppliers' reliability, retailers' demands, and facility production capacities. To deal with the uncertainty inherent to the parameters of the stochastic supply chain optimization problems and to determine optimal or close to optimal policies, many approximate deterministic equivalent models are proposed. In this paper, we consider the stochastic periodic inventory routing problem modeled as chance‐constrained optimization problem. We then propose a safety stock‐based deterministic optimization model to determine near‐optimal solutions to this chance‐constrained optimization problem. We investigate the issue of adequately setting safety stocks at the supplier's warehouse and at the retailers so that the promised service levels to the retailers are guaranteed, while distribution costs as well as inventory throughout the system are optimized. The proposed deterministic models strive to optimize the safety stock levels in line with the planned service levels at the retailers. Different safety stock models are investigated and analyzed, and the results are illustrated on two comprehensively worked out cases. We conclude this analysis with some insights on how safety stocks are to be determined, allocated, and coordinated in stochastic periodic inventory routing problem. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   
8.
This paper introduces a fast solution procedure to solve 100-node instances of the time-dependent orienteering problem (TD-OP) within a few seconds of computation time. Orienteering problems occur in logistic situations were an optimal combination of locations needs to be selected and the routing between the selected locations needs to be optimized. In the time-dependent variant, the travel time between two locations depends on the departure time at the first location. Next to a mathematical formulation of the TD-OP, the main contribution of this paper is the design of a fast and effective algorithm to tackle this problem. This algorithm combines the principles of an ant colony system (ACS) with a time-dependent local search procedure equipped with a local evaluation metric. Additionally, realistic benchmark instances with varying size and properties are constructed. The average score gap with the known optimal solution on these test instances is only 1.4% with an average computation time of 0.5 seconds. An extensive sensitivity analysis shows that the performance of the algorithm is insensitive to small changes in its parameter settings.  相似文献   
9.
10.
This paper, considers with the problem of production capacity and warehouse management in a supply network in which inter-plant mold transfers are enabled. The supply network has a limited number of very expensive molds which can be transferred from a plant to another making it possible for each plant to produce the entire product gamut. It is assumed that warehouses in this supply network can be activated and deactivated as required, and that material transfers from a warehouse to another are also possible. The objective is to develop a capacity and warehouse management plan that satisfies the expected market demands with the lowest possible cost. A mixed integer programming model for the problem is suggested and its properties are discussed. A linear programming-based heuristic that combines Lagrangian relaxation and linear programming duality to generate lower and upper bounds for the problem is proposed. Finally, based on a designed experiment the performance of the heuristic on a set of generated test problems is reported and discussed.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号