首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
In this paper we consider the single machine scheduling problems with exponential sum-of-logarithm-processing-times based learning effect. By the exponential sum-of-logarithm-processing-times based learning effect, we mean that the processing time of a job is defined by an exponent function of the sum of the logarithm of the processing times of the jobs already processed. We consider the following objective functions: the makespan, the total completion time, the sum of the quadratic job completion times, the total weighted completion time and the maximum lateness. We show that the makespan minimization problem, the total completion time minimization problem and the sum of the quadratic job completion times minimization problem can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem and the maximum lateness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

2.
In this paper, we consider the single machine scheduling problems with an actual time-dependent deterioration effect. By the actual time-dependent deterioration effect, we mean that the processing time of a job is defined by increasing function of total actual processing time of jobs in front of it in the sequence. We show that even with the introduction of an actual time-dependent deterioration to job processing times, makespan minimization problem, total completion time minimization problem, the total lateness, and the sum of the quadratic job completion times minimization problem remain polynomially solvable, respectively. We also show that the total weighted completion time minimization problem, the discounted total weighted completion time minimization problem, the maximum lateness minimization problem, and the total tardiness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

3.
In this paper a scheduling problem that takes into consideration a phenomenoncalled ‘aging effect’ with reference to Computer Numerical Controldrilling or cutting machines is investigated. In the aftermath of this effect anexecution of jobs leads to a deterioration of a machine; thus processing timesof jobs increase and the production facility becomes less efficient. However, itis highly desirable to minimize the negative influence of this effect. Ingeneral, it can be done by formulating such a problem in the scheduling contextand optimizing an order of jobs to minimize the given criterion. Therefore, onthis basis a makespan minimization problem on a single machine with releasedates and the aging effect is formulated, where the job processing times aredescribed by non-decreasing functions dependent on fatigue (wear) of machine. Itis proved that even the special cases of the problem are NP-hard. Moreover, someproblems equivalences are shown and polynomially solvable cases are alsoprovided.  相似文献   

4.
In this paper, we analyse the parallel machine makespan minimization problem with the general sum of processing time based learning or aging effects. First, we prove that an optimal solution to the single machine case can be found by priority rules. Next, for the considered parallel machine problem, we construct the exact dynamic programming algorithm that can operate on real-valued job processing times, which is the only exact algorithm for the analysed problem. The computational analysis confirms that it can solve optimally moderate problem instances.  相似文献   

5.
In this paper, we analyse the single processor maximum completion time (makespan) minimization problem with distinct release dates of jobs and the sum-of-processing time-based learning effect. We prove that the considered problem is strongly NP-hard, if, in addition to jobs with the same learning ratio, there are jobs with constant job processing times. Such jobs are not affected by learning and model, for instance, required system upgrades or training courses.  相似文献   

6.
In this paper, we analyse single machine scheduling problems with learning and aging effects to minimize one of the following objectives: the makespan with release dates, the maximum lateness and the number of late jobs. The phenomena of learning and aging are modeled by job processing times described by non-increasing (learning) or non-decreasing (aging) functions dependent on the number of previously processed jobs, i.e., a job position in a sequence. We prove that the considered problems are strongly NP-hard even if job processing times are described by simple linear functions dependent on a number of processed jobs. Additionally, we show a property of equivalence between problems with learning and aging models. We also prove that if the function describing decrease/increase of a job processing time is the same for each job then the problems with the considered objectives are polynomially solvable even if the function is arbitrary. Therefore, we determine the boundary between polynomially solvable and strongly NP-hard cases.  相似文献   

7.
In this paper, we show that the strong NP-hardness proof of the single machine makespan minimization problem with ready times and job processing times described by a non-increasing power function dependent on a job position in a sequence presented in Bachman and Janiak (J Oper Res Soc 55:257–264, 2004) is incorrect. Namely, the applied transformation from 3- Partition problem to the considered scheduling problem is polynomial not pseudopolynomial. Thus, the related problem is NP-hard, but it is not proved to be strongly NP-hard.  相似文献   

8.
同时具有学习效应和退化效应的单机排序问题   总被引:1,自引:0,他引:1  
本文给出了一种同时具有一般化学习效应和退化效应的单机排序模型。在此模型中,工件的实际加工时间既与工件所在位置又与其开工时间有关,且工件在加工之后具有一个配送时间。其中学习效应是工件所在位置的函数,退化效应是工件开工时间的函数。证明了极小化最大完工时间和极小化总完工时间问题是多项式可解的,在满足一定的条件下,极小化加权总完工时间和极小化最大延误问题也是多项式可解的。推广了一些已有文献中的结论。  相似文献   

9.
The paper is devoted to some single machine scheduling problems, where job processing times are defined by functions dependent on their positions in the sequence. It is assumed that each job is available for processing at its ready time. We prove some properties of the special cases of the problems for the following optimization criteria: makespan, total completion time and total weighted completion time. We prove strong NP-hardness of the makespan minimization problem for two different models of job processing time. The reductions are done from the well-known 3-Partition Problem. In order to solve the makespan minimization problems, we suggest the Earliest Ready Date algorithms, for which the worst-case ratios are calculated. We also prove that the makespan minimization problem with job ready times is equivalent to the maximum lateness minimization problem.  相似文献   

10.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

11.
Single Machine Scheduling with Learning Effect Considerations   总被引:11,自引:0,他引:11  
In this paper we study a single machine scheduling problem in which the job processing times will decrease as a result of learning. A volume-dependent piecewise linear processing time function is used to model the learning effects. The objective is to minimize the maximum lateness. We first show that the problem is NP-hard in the strong sense and then identify two special cases which are polynomially solvable. We also propose two heuristics and analyse their worst-case performance.  相似文献   

12.
The paper deals with the single machine scheduling problems with a time-dependent learning effect and deteriorating jobs. By the effects of time-dependent learning and deterioration, we mean that the processing time of a job is defined by function of its starting time and total normal processing time of jobs in front of it in the sequence. It is shown that even with the introduction of a time-dependent learning effect and deteriorating jobs to job processing times, the single machine makespan minimization problem remain polynomially solvable. But for the total completion time minimization problem, the classical shortest processing time first rule or largest processing time first rule cannot give an optimal solution.  相似文献   

13.
本文考虑了机器具有不可用区间且工件可拒绝下的单机重新排序问题,在该问题中,给定一个工件集需在一台机器上加工,每个工件有自己的加工时间和权重,且对该工件集目标函数为极小化总加权完工时间的排序计划已给定,根据该排序计划中每个工件的完工时间已确定每个工件的承诺交付时间。然而,在工件正式开始加工前,原计划用于加工的某段时间区间因临时用于检修机器而导致机器在该时间区间不再可用,需要对工件重新排序。为了确保在新的重新排序中,工件的延误成本不致太大,决策者可以选择拒绝部分工件,但需支付相应的拒绝费用。任务是确定接受工件集和拒绝工件集,并将接受的工件在考虑机器具有不可用区间的条件下重新排序使得接受工件集的总加权完工时间,总拒绝费用及赋权最大延误之和最小。该问题是NP-困难的,对此给出了伪多项式时间动态规划精确算法,利用稀疏技术设计了完全多项式时间近似方案。  相似文献   

14.
On scheduling an unbounded batch machine   总被引:1,自引:0,他引:1  
A batch machine is a machine that can process up to c jobs simultaneously as a batch, and the processing time of the batch is equal to the longest processing time of the jobs assigned to it. In this paper, we deal with the complexity of scheduling an unbounded batch machine, i.e., c=+∞. We prove that minimizing total tardiness is binary NP-hard, which has been an open problem in the literature. Also, we establish the pseudopolynomial solvability of the unbounded batch machine scheduling problem with job release dates and any regular objective. This is distinct from the bounded batch machine and the classical single machine scheduling problems, most of which with different release dates are unary NP-hard. Combined with the existing results, this paper provides a nearly complete mapping of the complexity of scheduling an unbounded batch machine.  相似文献   

15.
研究工件可以转包加工的单台机排序问题: 有n个工件, 在零时刻已经到达一个单台机处, 每个工件可以由加工者自有的单台机器加工或者转包给其他机器加工. 如果工件被转包加工, 那么其完工时间等于在自有机器上的加工时间, 而产生的加工费用与在自有机器上加工的费用不同. 假设被转包加工的工件的完工时间和加工费用与转包加工机器的总负载没有关系.目标函数是最小化工件最大完工时间与总加工费用的加权和. 该问题已经被证明是NP-难的. 最后给出该问题的伪多项式时间最优算法, 并且提出一个完全多项式时间近似方案(FPTAS).  相似文献   

16.
In this communication we consider a two machine open shop in which a job requires processing on both machines. However, in contrast to the classical open shop, the two operations of any given job may overlap in time. The objective function under consideration is the minimization of the total completion time. This model has been considered before by Wagneur and Sriskandarajah [Eur. J. Oper. Res. 71 (1993) 366] and they presented a proof showing that minimizing the total completion time in a two machine open shop with jobs overlap is strongly NP-hard. Their proof is based on a reduction of the numerical matching with target sums (NMTS) problem; however, their proof is unfortunately not correct. In this communication we provide a counterexample that shows that their reduction does not hold. Our counterexample implies that the complexity status of the two machine open shop with job overlap remains open.  相似文献   

17.
具有一般学习效应的单机排序问题   总被引:1,自引:0,他引:1  
在具有学习效应的环境下,由于机器重复加工相同或相似的工件,因此以后加工的工件的加工时间变小.本文研究新的更一般的学习效应:Dejong学习效应.我们证明单机最大完工时间问题,总完工时间问题和两类多目标问题是多项式时间可解的.  相似文献   

18.
The paper deals with single machine scheduling problems with setup time considerations where the actual processing time of a job is not only a non-decreasing function of the total normal processing times of the jobs already processed, but also a non-increasing function of the job’s position in the sequence. The setup times are proportional to the length of the already processed jobs, i.e., the setup times are past-sequence-dependent (p-s-d). We consider the following objective functions: the makespan, the total completion time, the sum of the δth (δ ≥ 0) power of job completion times, the total weighted completion time and the maximum lateness. We show that the makespan minimization problem, the total completion time minimization problem and the sum of the δ th (δ ≥ 0) power of job completion times minimization problem can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem and the maximum lateness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

19.
考虑了工件有到达时间且拒绝工件总个数不超过某个给定值的单机平行分批排序问题.在该问题中,给定一个工件集和一台可以进行批处理加工的机器.每个工件有它的到达时间和加工时间;对于每个工件来说要么被拒绝要么被接受安排在机器的某一个批次里进行加工;一个工件如果被拒绝,则需支付该工件对应的拒绝费用.为了保证一定的服务水平,要求拒绝工件的总个数不超过给定值.目标是如何安排被接受工件的加工批次和加工次序使得其最大完工时间与被拒绝工件的总拒绝费用之和最小.该问题是NP-难的,对此给出了伪多项式时间动态规划精确算法,2-近似算法和完全多项式时间近似方案.  相似文献   

20.
In this paper, we consider the single-machine scheduling problems with nonlinear deterioration. By the nonlinear deterioration effect, we mean that the processing times of jobs are nonlinear functions of their starting times. We show that even with the introduction of nonlinear deterioration to job processing times, single machine makespan minimization problem remains polynomially solvable. We also show that an optimal schedule of the total completion time minimization problem is V-shaped with respect to job normal processing times. A heuristic algorithm utilizing the V-shaped property is proposed, and computational experiments show that it performs effectively and efficiently in obtaining near-optimal solutions.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号