1.
In this note, single machine scheduling and minimizing absolute flow time deviation (TAFD) are considered. The relationship between this problem and the mean absolute deviation of job completion times about a common due date (MAD) is discussed. Based on the MAD problem optimal solutions of the TAFD problem are given. Furthermore, the generalization of the problem to the multiple machine case is discussed and an efficient algorithm for generating many optimal solutions of the problem, in the multi-machine case, is given.  相似文献   

2.
In this paper, we present new approximation results for the offline problem of single machine scheduling with sequence-independent set-ups and item availability, where the jobs to be scheduled are independent (i.e., have no precedence constraints) and have a common release time.We present polynomial-time approximation algorithms for two versions of this problem. In the first version, the input includes a weight for each job, and the goal is to minimize the total weighted completion time. On any input, our algorithm produces a schedule whose total weighted completion time is within a factor 2 of optimal for that input.In the second version, the input includes a due date for each job, and the goal is to minimize the maximum lateness of any job. On any input, our algorithm produces a schedule with the following performance guarantee: the maximum lateness of a job is at most the maximum lateness of the optimal schedule on a machine that runs at half the speed of our machine.  相似文献   

3.
We consider a deterministic n-job, single machine scheduling problem with the objective of minimizing the Mean Squared Deviation (MSD) of job completion times about a common due date (d). The MSD measure is non-regular and its value can decrease when one or more completion times increases. MSD problem is connected with the Completion Time Variance (CTV) problem and has been proved to be NP-hard. This problem finds application in situations where uniformity of service is important. We present an exact algorithm of pseudo-polynomial complexity, using ideas from branch and bound and dynamic programming. We propose a dominance rule and also develop a lower bound on MSD. The dominance rule and lower bound are effectively combined and used in the development of the proposed algorithm. The search space is explored using the breadth first branching strategy. The asymptotic space complexity of the algorithm is O(nd). Irrespective of the version of the problem – tightly constrained, constrained or unconstrained – the proposed algorithm provides optimal solutions for problem instances up to 1000 jobs size under different due date settings.  相似文献   

4.
研究一类优化交货期窗口的两阶段供应链排序问题. 优化交货期窗口是指交货期窗口的开始与结束时刻是决策变量, 不是输入常量. 两阶段是指工件先加工, 后运输: 加工阶段是一台加工机器逐个加工工件;运输阶段是无限台车辆分批运输完工的工件. 工件的开始运输时刻与完工时刻之差定义为工件的储存时间, 且有相应的储存费用. 若工件的运输完成时刻早于(晚于)交货期窗口的开始(结束)时刻, 则有相应的提前(延误)惩罚费用. 目标是极小化总提前惩罚费用、总延误惩罚费用、总储存费用、总运输费用以及与交货期窗口有关的费用之和. 针对单位时间的延误惩罚费用不超过单位时间的储存费用、单位时间的储存费用不超过单位时间的提前惩罚费用的情形, 给出了时间复杂性为O(n^{8})的动态规划算法.  相似文献   

5.
研究工件的实际加工时间既具有指数学习效应,又依赖所消耗资源的准时制排序问题.在模型中,探讨了共同交货期(CON)和松弛交货期(SLK)两种情形.管理者的目标是确定最优序、最优资源分配方案和最佳工期(共同交货期或松弛交货期)以便极小化工件的总延误、总提前、总工期和资源消耗费用的总和.对于工件的实际加工时间是资源消耗量的线性函数的排序问题,通过将其转化为指派模型,给出了时间复杂性为O(n~3)的算法,从而证明该类排序问题是多项式时间可求解的.针对工件的实际加工时间是资源消耗量的凸函数的排序问题,也给出了多项式算法.  相似文献   

6.
We address a single-machine scheduling problem where the objective is to minimize the weighted mean absolute deviation of job completion times from their weighted mean. This problem and its precursors aim to achieve the maximum admissible level of service equity. It has been shown earlier that the unweighted version of this problem is NP-hard in the ordinary sense. For that version, a pseudo-polynomial time dynamic program and a 2-approximate algorithm are available. However, not much (except for an important solution property) exists for the weighted version. In this paper, we establish the relationship between the optimal solution to the weighted problem and a related one in which the deviations are measured from the weighted median (rather than the mean) of the job completion times; this generalizes the 2-approximation result mentioned above. We proceed to give a pseudo-polynomial time dynamic program, establishing the ordinary NP-hardness of the problem in general. We then present a fully-polynomial time approximation scheme as well. Finally, we report the findings from a limited computational study on the heuristic solution of the general problem. Our results specialize easily to the unweighted case; they also lead to an approximation of the set of schedules that are efficient with respect to both the weighted mean absolute deviation and the weighted mean completion time.  相似文献   

7.
This work is concerned with scheduling problems for a single machine. Taking earliness and tardiness of completion time and due–date value into consideration, the objective function with a common due date is considered. The processing time of each job is random. Sufficient conditions guaranteeing an optimal SEPT sequence are derived. Under exponential and normal processing times, further results are obtained  相似文献   

8.
张龙 《运筹学学报》2017,21(2):126-134
研究一类储存时间有上限的两阶段供应链排序问题.两阶段是指工件先加工,后运输:加工阶段是一台加工机器逐个加工工件;运输阶段是无限台车辆分批运输完工的工件.工件的运输完成时刻与完工时刻之差定义为工件的储存时间,且有相应的储存费用,且任意工件的储存时间都不超过某一常数.若工件的运输完成时刻早于(晚于)交货期窗口的开始(结束)时刻,则有相应的提前(延误)惩罚费用.目标是极小化总提前惩罚费用、总延误惩罚费用、总储存费用、总运输费用以及与交货期窗口有关的费用之和.先证明该问题是NP-难的,后对单位时间的储存费用不超过单位时间的延误惩罚费用的情形给出了伪多项式时间算法.  相似文献   

9.
In this paper we research the problem in which the objective is to minimize the sum of squared deviations of job expected completion times from the due date, and the job processing times are stochastic. In the problem the machine is subject to stochastic breakdowns and all jobs are preempt-repeat. In order to show that the replacing ESSD by SSDE is reasonable, we discuss difference between ESSD function and SSDE function. We first give an express of the expected completion times for both cases without resampling and with resampling. Then we show that the optimal sequence of the problem V-shaped with respect to expected occupying time. A dynamic programming algorithm based on the V-shape property of the optimal sequence is suggested. The time complexity of the algorithm is pseudopolynomial.  相似文献   

10.
In the order scheduling problem, every job (order) consists of several tasks (product items), each of which will be processed on a dedicated machine. The completion time of a job is defined as the time at which all its tasks are finished. Minimizing the number of late jobs was known to be strongly NP-hard. In this note, we show that no FPTAS exists for the two-machine, common due date case, unless P = NP. We design a heuristic algorithm and analyze its performance ratio for the unweighted case. An LP-based approximation algorithm is presented for the general multicover problem. The algorithm can be applied to the weighted version of the order scheduling problem with a common due date.  相似文献   

11.
具有指数和位置学习效应的机器排序问题   总被引:1,自引:0,他引:1  
本文考虑指数学习效应和位置学习效应同时发生的新的排序模型.工件的实际加工时间不仅依赖于已经加工过工件正常加工时间之和的指数函数,而且依赖于该工件所在的位置.单机排序情形下,对于最大完工时间和总完工时间最小化问题给出多项式时间算法.此外某些特殊情况下,总权完工时间和最大延迟最小化问题也给出了多项时间算法.流水机排序情形,对最大完工时间和总完工时间最小化问题在某些特殊情形下给出多项时间算法.  相似文献   

12.
The purpose of this study is to explore the single-machine scheduling with the effects of exponential learning and general deterioration. By the effects of exponential learning and general deterioration, we meant that job processing time is decided by the functions of their starting time and positions in the sequence. Results showed that with the introduction of learning effect and deteriorating jobs to job processing time, single-machine makespan, and sum of completion time (square) minimization problems remained polynomially solvable, respectively. But for the following objective functions: the weighted sum of completion time and the maximum lateness, this paper proved that the weighted smallest basic processing time first (WSPT) rule and the earliest due date first (EDD) rule constructed the optimal sequence under some special cases, respectively.  相似文献   

13.
We study the problem of scheduling N independent jobs in a job-shop environment. Each job must be processed on M machines according to individual routes. The objective is to minimize the maximum completion time of the jobs. First, the job-shop problem is reduced to a flow-shop problem with job precedence constraints. Then, a set of flow-shop algorithms are modified to solve it. To evaluate the quality of these heuristics, several lower bounds on the optimal solution have been computed and compared with the heuristic solutions for 3040 problems. The heuristics appear especially promising for job-shop problems with ‘flow-like’ properties.  相似文献   

14.
There is a fabrication machine available for processing a set of jobs. Each job is associated with a due date and consists of two parts, one is common among all products and the other is unique to itself. The unique components are processed individually and the common parts are grouped into batches for processing. A constant setup time is incurred when each batch is formed. The completion time of a job is defined as the time when both of its unique and common components are completed. In this paper, we consider two different objectives. The first problem seeks to minimize the maximum tardiness, and the second problem is to minimize the number of tardy jobs. To minimize the maximum tardiness, we propose a dynamic programming algorithm that optimally solves the problem in polynomial time. Next, we show NP-hardness proof and design a pseudo-polynomial time dynamic programming algorithm for the problem of minimizing the number of tardy jobs.  相似文献   

15.
Deteriorating jobs scheduling problems have been extensively studied in recent years. However, it is assumed that there is a common goal to minimize for all jobs in most of the research. In many management situations, multiple agents compete on the usage of a common processing resource. In this paper, we considered a single-machine scheduling problem with a linear deterioration assumption where the objective is to minimize the total weighted completion time of jobs from the first agent with the restriction that no tardy job is allowed for the second agent. We proposed a branch-and-bound algorithm and three heuristic algorithms to search for the optimal solution and near-optimal solutions, respectively. A computational experiment was conducted to evaluate the performance of the proposed algorithms.  相似文献   

16.
本文考虑n个独立工件在一台机器上加工的排序问题,每个工件J_i的交货期设置为d_i=kP_i~α(α≥1),目标是寻找工件最优加工时间乘子及工件最优排序S(?),使工件完工时间与交货期的最大偏差最小。给出寻找最优加工时间乘子k(?)及工件最优排序S(?)的方法。  相似文献   

17.
The relocation problem addressed in this paper is to determine a reconstruction sequence for a set of old buildings, under a limited budget, such that there is adequate temporary space to house the residents decanted during rehabilitation. It can be regarded as a resource-constrained scheduling problem where there is a set of jobs to be processed on a single machine. Each job demands a number of resources for processing and returns probably a different number of resources on its completion. Given a number of initial resources, the problem seeks to determine if there is a feasible sequence for the successful processing of all the jobs. Two generalizations of the relocation problem in the context of single machine scheduling with due date constraints are studied in this paper. The first problem is to minimize the weighted number of tardy jobs under a common due date. We show that it is NP-hard even when all the jobs have the same tardy weight and the same resource requirement. A dynamic programming algorithm with pseudo-polynomial computational time is proposed for the general case. In the second problem, the objective is to minimize the maximum tardiness when each job is associated with an individual due date. We prove that it is strongly NP-hard. We also propose a pseudo-polynomial time dynamic programming algorithm for the case where the number of possible due dates is predetermined.  相似文献   

18.
We consider a two-machine flow shop problem with a common due date where the objective is to minimize the sum of functions which penalize early as well as tardy completion of jobs. Since the problem is NP-hard in the strong sense, we investigate some general properties of optimal schedules for the problem, we develop lower and upper bounds, derive dominance criteria, and propose an enumerative algorithm for finding an optimal schedule. The performance of the proposed algorithm together with the influence of the individual components is thoroughly discussed.  相似文献   

19.
We study a single machine slack due date assignment (usually referred to as SLK) scheduling problem with deteriorating jobs and a rate-modifying activity. The deterioration effect manifest such that the job processing time is a function of its starting time in a sequence. The rate-modifying activity is an activity that changes the processing rate of machine, i.e., the machine performs a rate-modifying activity. Hence the actual processing time of a job is a variable, which depends not only on its starting time in a sequence but also on whether it is scheduled before or after a rate-modifying activity. The goal is to schedule the rate-modifying activity, the optimal common flow allowance and the sequence of jobs to minimize the total earliness, the total tardiness and the common flow allowance cost. We show that the problem remains polynomially solvable under the proposed model.  相似文献   

20.
In this paper, we consider single machine SLK due date assignment scheduling problem in which job processing times are controllable variables with linear costs. The objective is to determine the optimal sequence, the optimal common flow allowance and the optimal processing time compressions to minimize a total penalty function based on earliness, tardiness, common flow allowance and compressions. We solve the problem by formulating it as an assignment problem which is polynomially solvable. For some special cases, we present an O(n logn) algorithm to obtain the optimal solution respectively.  相似文献   