首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 140 毫秒
1.
We study a coordinated scheduling problem of production and transportation in which each job is transported to a single batching machine for further processing. There are m vehicles that transport jobs from the holding area to the batching machine. Each vehicle can transport only one job at a time. The batching machine can process a batch of jobs simultaneously where there is an upper limit on the batch size. Each batch to be processed occurs a processing cost. The problem is to find a joint schedule of production and transportation such that the sum of the total completion time and the total processing cost is optimized. For a special case of the problem where the job assignment to the vehicles is predetermined, we provide a polynomial time algorithm. For the general problem, we prove that it is NP-hard (in the ordinary sense) and present a pseudo-polynomial time algorithm. A fully polynomial time approximation scheme for the general problem is obtained by converting an especially designed pseudo-polynomial dynamic programming algorithm.  相似文献   

2.
In parallel-batching machine scheduling, all jobs in a batch start and complete at the same time, and the processing time of the batch is the maximum processing time of any job in it. For the unbounded parallel-batching machine scheduling problem of minimizing the maximum lateness, denoted 1|p-batch|L_(max), a dynamic programming algorithm with time complexity O(n~2) is well known in the literature.Later, this algorithm is improved to be an O(n log n) algorithm. In this note, we present another O(n log n) algorithm with simplifications on data structure and implementation details.  相似文献   

3.
研究具有两个不相容工件族单位工件单机有界平行分批的在线排序问题.工件按时在线到达,目标是最小化最大完工时间.在有界平行分批排序中,容量有限制机器最多可将b个工件形成一批同时加工,每个工件及每一批的加工时间为1.不相容工件族是指来自不同工件组的工件不能放在同一批加工.对该问题提供了一个竞争比为√17+3/4的最好可能的在线算法.  相似文献   

4.
研究具有前瞻区间的两个不相容工件组单位工件单机无界平行分批在线排序问题.工件按时在线到达, 目标是最小化最大完工时间. 在无界平行分批排序中, 一台容量无限制机器可将多个工件形成一批同时加工, 每一批的加工时间等于该批中最长工件的加工时间. 具有前瞻区间是指在时刻t, 在线算法能预见到时间区间(t,t+\beta]内到达的所有工件的信息.不可相容的工件组是指属于不同组的工件不能安排在同一批中加工.对该问题提供了一个竞争比为\ 1+\alpha 的最好可能的在线算法,其中\ \alpha 是方程2\alpha^{2}+(\beta +1)\alpha +\beta -2=0的一个正根, 这里0\leq \beta <1.  相似文献   

5.
This paper studies the bicriteria problem of scheduling n jobs on a serial-batching machine to minimize maximum cost and makespan simultaneously. A serial-batching machine is a machine that can handle up to b jobs in a batch and jobs in a batch start and complete respectively at the same time and the processing time of a batch is equal to the sum of the processing times of jobs in the batch. When a new batch starts, a constant setup time s occurs. We confine ourselves to the unbounded model, where b ≥ n. We present a polynomial-time algorithm for finding all Pareto optimal solutions of this bicriteria scheduling problem.  相似文献   

6.
考虑了工件有到达时间且拒绝工件总个数不超过某个给定值的单机平行分批排序问题.在该问题中,给定一个工件集和一台可以进行批处理加工的机器.每个工件有它的到达时间和加工时间;对于每个工件来说要么被拒绝要么被接受安排在机器的某一个批次里进行加工;一个工件如果被拒绝,则需支付该工件对应的拒绝费用.为了保证一定的服务水平,要求拒绝工件的总个数不超过给定值.目标是如何安排被接受工件的加工批次和加工次序使得其最大完工时间与被拒绝工件的总拒绝费用之和最小.该问题是NP-难的,对此给出了伪多项式时间动态规划精确算法,2-近似算法和完全多项式时间近似方案.  相似文献   

7.
成组排序具有深刻的实际应用背景,是近年来国外研究得较多的一个热点.已有的某些动态规划算法的复杂性随分类数的增长呈指数型增长趋势,本文用“归并”和解不超过四个新的子问题的方法把分类数较大时的问题转化为分类数较小时的相应问题,简化了问题的求解.  相似文献   

8.
考虑工件可自由下线最小化总完工时间的有界平行分批排序问题. 在该问题中, 一台平行批机器可以同时处理 b 个工件作为一个平行批, 这里b 是批容量, 一个批的加工时间等于分配给这个批的工件的最大加工时间. 关于可自由下线工件, 每一个工件的完工时间等于包含这个工件的批的开工时间与工件的加工时间的和. 也就是, 如果一个批B 有一个开工时间S, 那么包含在批B 中的每一个工件J_j 的开工时间定义为S, 而它的完工时间定义为S+p_j, 这里p_j 是工件J_j 的加工时间. 对此问题, 首先研究最优排序的一些性质. 然后, 基于这些性质, 给出一个运行时间为O(n^{b (b-1)})的动态规划算法.  相似文献   

9.
本文研究一类具有线性恶化效应的单机在线分批排序问题,工件$J_j$的加工时间为$p_j=b_j+\alpha t$, 其中$b_j$为基本加工时间, $\alpha>0$为恶化率, $t$是开工时间. 工件的到达时间是未知的, 工件的基本加工时间只有在工件到达之后才能知道.多个工件可以作为一批被机器同时加工, 批的加工时间为该批中工件最大加工时间.本文对于目标为极小化makespan的批容量无限的单机问题给出一个在线算法$\beta H^\infty$,并证明其竞争比和问题的下界相同, 进而算法是最优的.  相似文献   

10.
The on-line problem of scheduling on a batch processing machine with nonidentical job sizes to minimize makespan is considered. The batch processing machine can process a number of jobs simultaneously as long as the total size of these jobs being processed does not exceed the machine capacity. The processing time of a batch is given by the longest processing time of any job in the batch. Each job becomes available at its arrival time, which is unknown in advance, and its processing time becomes known upon its arrival. The paper deals with two variants: the case only with two distinct arrival times and the general case. For the first case, an on-line algorithm with competitive ratio 119/44 is given. For the latter one, a simple algorithm with competitive ratio 3 is given. For both variants the better ratios can be obtained if the problem satisfies proportional assumption.  相似文献   

11.
并行分批排序起源于半导体芯片制造过程。在并行分批排序中,工件可成批加工,批加工机器最多可同时加工B个工件,批的加工时间为批中所有工件的最大工时。首先根据传统的机器环境和目标函数对并行分批排序已有成果进行分类介绍,主要为单机和平行机的机器环境,以及极小化最大完工时间、极小化总完工时间、极小化最大延迟、极小化误工工件数、极小化总延误和极小化最大延误的目标函数;然后梳理了由基本问题所衍生出来的具有新特点的16类新型并行分批排序,包括差异尺寸工件、多目标、工件加工时间或顺序存在限制、考虑费用和具有特殊机制等情况;最后展望未来的研究方向。  相似文献   

12.
We consider a batch scheduling problem on a single machine which processes jobs with resource dependent setup and processing time in the presence of fuzzy due-dates given as follows:1. There are n independent non-preemptive and simultaneously available jobs processed on a single machine in batches. Each job j has a processing time and a due-date.2. All jobs in a batch are completed together upon the completion of the last job in the batch. The batch processing time is equal to the sum of the processing times of its jobs. A common machine setup time is required before the processing of each batch.3. Both the job processing times and the setup time can be compressed through allocation of a continuously divisible resource. Each job uses the same amount of the resource. Each setup also uses the same amount of the resource.4. The due-date of each job is flexible. That is, a membership function describing non-decreasing satisfaction degree about completion time of each job is defined.5. Under above setting, we find an optimal batch sequence and resource values such that the total weighted resource consumption is minimized subject to meeting the job due-dates, and minimal satisfaction degree about each due-date of each job is maximized. But usually we cannot optimize two objectives at a time. So we seek non-dominated pairs i.e. the batch sequence and resource value, after defining dominance between solutions.A polynomial algorithm is constructed based on linear programming formulations of the corresponding problems.  相似文献   

13.
In this paper, we present a mixed-integer fuzzy programming model and a genetic algorithm (GA) based solution approach to a scheduling problem of customer orders in a mass customizing furniture industry. Independent job orders are grouped into multiple classes based on similarity in style so that the required number of setups is minimized. The family of jobs can be partitioned into batches, where each batch consists of a set of consecutively processed jobs from the same class. If a batch is assigned to one of available parallel machines, a setup is required at the beginning of the first job in that batch. A schedule defines the way how the batches are created from the independent jobs and specifies the processing order of the batches and that of the jobs within the batches. A machine can only process one job at a time, and cannot perform any processing while undergoing a setup. The proposed formulation minimizes the total weighted flowtime while fulfilling due date requirements. The imprecision associated with estimation of setup and processing times are represented by fuzzy sets.  相似文献   

14.
This paper investigates single-batch and batch-single flow shop scheduling problem taking transportation among machines into account. Both transportation capacity and transportation times are explicitly considered. While the single processing machine processes one job at a time, the batch processing machine processes a batch of jobs simultaneously. The batch processing time is the longest processing times of jobs assigned to that batch.Each problem is formulated as a mixed integer programming model to find optimal makespan. Lower bounds and heuristic algorithms are proposed and computational experiments are carried out to verify their effectiveness.  相似文献   

15.
On scheduling an unbounded batch machine   总被引:1,自引:0,他引:1  
A batch machine is a machine that can process up to c jobs simultaneously as a batch, and the processing time of the batch is equal to the longest processing time of the jobs assigned to it. In this paper, we deal with the complexity of scheduling an unbounded batch machine, i.e., c=+∞. We prove that minimizing total tardiness is binary NP-hard, which has been an open problem in the literature. Also, we establish the pseudopolynomial solvability of the unbounded batch machine scheduling problem with job release dates and any regular objective. This is distinct from the bounded batch machine and the classical single machine scheduling problems, most of which with different release dates are unary NP-hard. Combined with the existing results, this paper provides a nearly complete mapping of the complexity of scheduling an unbounded batch machine.  相似文献   

16.
We present on-line algorithms to minimize the makespan on a single batch processing machine. We consider a parallel batching machine that can process up to b jobs simultaneously. Jobs in the same batch complete at the same time. Such a model of a batch processing machine has been motivated by burn-in ovens in final testing stage of semiconductor manufacturing. We deal with the on-line scheduling problem when jobs arrive over time. We consider a set of independent jobs. Their number is not known in advance. Each job is available at its release date and its processing requirement is not known in advance. This general problem with infinite machine capacity is noted 1∣p − batch, rj, b = ∞∣Cmax. Deterministic algorithms that do not insert idle-times in the schedule cannot be better than 2-competitive and a simple rule based on LPT achieved this bound [Z. Liu, W. Yu, Scheduling one batch processor subject to job release dates, Discrete Applied Mathematics 105 (2000) 129–136]. If we are allowed to postpone start of jobs, the performance guarantee can be improved to 1.618. We provide a simpler proof of this best known lower bound for bounded and unbounded batch sizes. We then present deterministic algorithms that are best possible for the problem with unbounded batch size (i.e., b = ∞) and agreeable processing times (i.e., there cannot exist an on-line algorithm with a better performance guarantee). We then propose another algorithm that leads to a best possible algorithm for the general problem with unbounded batch size. This algorithm improves the best known on-line algorithm (i.e. [G. Zhang, X. Cai, C.K. Wong, On-line algorithms for minimizing makespan on batch processing machines, Naval Research Logistics 48 (2001) 241–258]) in the sense that it produces a shortest makespan while ensuring the same worst-case performance guarantee.  相似文献   

17.
We consider a scheduling model in which several batches of jobs need to be processed by a single machine. During processing, a setup time is incurred whenever there is a switch from processing a job in one batch to a job in another batch. All the jobs in the same batch have a common due date that is either externally given as an input data or internally determined as a decision variable. Two problems are investigated. One problem is to minimize the total earliness and tardiness penalties provided that each due date is externally given. We show that this problem is NP-hard even when there are only two batches of jobs and the two due dates are unrestrictively large. The other problem is to minimize the total earliness and tardiness penalties plus the total due date penalty provided that each due date is a decision variable. We give some optimality properties for this problem with the general case and propose a polynomial dynamic programming algorithm for solving this problem with two batches of jobs. We also consider a special case for both of the problems when the common due dates for different batches are all equal. Under this special case, we give a dynamic programming algorithm for solving the first problem with an unrestrictively large due date and for solving the second problem. This algorithm has a running time polynomial in the number of jobs but exponential in the number of batches.  相似文献   

18.
研究工件可提前预知信息的在线分批排序问题, 工件的预知信息时间依时间到达, 目标为极小化最大完工时间. 已知从工件的信息可预知到该工件可加工需要时间~$a$, 所有工件的最大加工时间为~$p_{{\rm max}}$, 多个工件可以作为一批被机器同时加工, 批的加工时间为该批工件中最长加工时间. 对于批容量无限的单机问题给出一个在线算法~$\gamma H^\infty$, 并证明其竞争比和问题的下界都为~$1+\gamma$, 其中~$\gamma=\left(-1+\sqrt{1+\frac{4p_{{\rm max}}}{p_{{\rm max}}+a}}\right)/2$, 进而算法是最优的.  相似文献   

19.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

20.
研究工件可以转包加工的单台机排序问题: 有n个工件, 在零时刻已经到达一个单台机处, 每个工件可以由加工者自有的单台机器加工或者转包给其他机器加工. 如果工件被转包加工, 那么其完工时间等于在自有机器上的加工时间, 而产生的加工费用与在自有机器上加工的费用不同. 假设被转包加工的工件的完工时间和加工费用与转包加工机器的总负载没有关系.目标函数是最小化工件最大完工时间与总加工费用的加权和. 该问题已经被证明是NP-难的. 最后给出该问题的伪多项式时间最优算法, 并且提出一个完全多项式时间近似方案(FPTAS).  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号