首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到3条相似文献,搜索用时 0 毫秒
1.
For the injector Scheme-Ⅰ test stand of the China-ADS (Accelerator Driven subcritical System), a beam with the maximum power of 100 kW will be produced and transported to the beam dump. To solve the very high thermal load problem at the dump, two measures are taken to deal with the huge power density at the target. One is to enlarge the contact area between the beam and the target, and this is to be accomplished by expanding the beam profile at the target and using slanted target plates. The other is to produce a more homogenous beam profile at the target to minimize the maximum power density. Here the beam dump line is designed to meet the requirement of beam expansion and homogenization at 3 different energies (3.2 MeV, 5 MeV and 10 MeV), and the step-like field magnets are employed for the beam spot homogenization. Taking into account the fact that the space charge effects are very strong at such low beam energies, the simulations have included space charge effects and errors which show that the beam line can meet the requirements very well. In the meantime, the alternative beam design using standard multipole magnets is also presented.  相似文献   

2.
For the injector Scheme- test stand of the China-ADS(Accelerator Driven subcritical System), a beam with the maximum power of 100 k W will be produced and transported to the beam dump. To solve the very high thermal load problem at the dump, two measures are taken to deal with the huge power density at the target.One is to enlarge the contact area between the beam and the target, and this is to be accomplished by expanding the beam profile at the target and using slanted target plates. The other is to produce a more homogenous beam profile at the target to minimize the maximum power density. Here the beam dump line is designed to meet the requirement of beam expansion and homogenization at 3 different energies(3.2 Me V, 5 Me V and 10 Me V), and the step-like field magnets are employed for the beam spot homogenization. Taking into account the fact that the space charge effects are very strong at such low beam energies, the simulations have included space charge effects and errors which show that the beam line can meet the requirements very well. In the meantime, the alternative beam design using standard multipole magnets is also presented.  相似文献   

3.
BEPCⅡ, the upgrade project of Beijing Electron Positron Collider (BEPC), is an accelerator with large beam current and high luminosity, so an efficient and stable injector is required. Several beam diagnostic and monitoring instruments are used. A new diagnostic instrument — wire scanner, has been designed and will be used to measure the profile of the linac beam of BEPCⅡ. This paper describes the prototype of this system and the cause of heat generating of the wire. Some simulation results of the heat and force by using finite element method software—ANSYS®,2) are presented and discussed.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号