全文获取类型
收费全文 | 193篇 |
免费 | 27篇 |
专业分类
化学 | 10篇 |
力学 | 1篇 |
综合类 | 7篇 |
数学 | 190篇 |
物理学 | 12篇 |
出版年
2023年 | 2篇 |
2022年 | 6篇 |
2021年 | 6篇 |
2020年 | 5篇 |
2019年 | 6篇 |
2018年 | 8篇 |
2017年 | 3篇 |
2016年 | 10篇 |
2015年 | 3篇 |
2014年 | 16篇 |
2013年 | 15篇 |
2012年 | 9篇 |
2011年 | 15篇 |
2010年 | 7篇 |
2009年 | 21篇 |
2008年 | 23篇 |
2007年 | 16篇 |
2006年 | 10篇 |
2005年 | 8篇 |
2004年 | 5篇 |
2003年 | 6篇 |
2002年 | 4篇 |
2001年 | 2篇 |
1999年 | 1篇 |
1998年 | 7篇 |
1997年 | 3篇 |
1996年 | 1篇 |
1986年 | 1篇 |
1982年 | 1篇 |
排序方式: 共有220条查询结果,搜索用时 15 毫秒
1.
2.
3.
4.
Jeffrey C. Johnson Dawn L. Parks 《Computational & Mathematical Organization Theory》1998,4(3):223-239
Earlier research has shown a relationship between various forms of structural centrality and perceived leadership and role
satisfaction in small experimental groups. The limited amount of research on this topic in naturally occurring social networks
has yielded results that often conflict with one another. Different results have generally been attributed to possible differences
in task environments. This paper examines the relationship between two types of structural centrality and perceived influence,
role satisfaction, and perceived effectiveness in an environmental resource management program. Findings in this paper suggest
that the observed differences in relationships between the network and other variables is partly a function of global network
properties (e.g., marginality of subgroups) and related task environments.
This revised version was published online in August 2006 with corrections to the Cover Date. 相似文献
5.
S. Küppers 《Accreditation and quality assurance》1997,2(1):30-35
Any analytical data is used to provide information about a sample. The "possible error" of the measurement can be of extreme
importance in order to have complete information. The measurement uncertainty concept is a way to achieve quantitative information
about this "possible error" using an estimation procedure. On the basis of the analytical result, the chemist makes a decision
on the next step of the development process. If the uncertainty is unknown, the information is not complete; therefore this
decision might be impossible. The major problem for the in-process control (IPC) procedure is that not only the repeatability
but also the intermediate precision (which expresses the variations within laboratories related to different days, different
analysts, different equipment, etc.) has to be good enough to make a decision. Unfortunately, the statistical information
achieved from one single analytical run only gives information about the repeatability. This paper shows that the estimation
of the measurement uncertainty for IPC is a way to solve the problem and gives the necessary information about the quality
of the procedure. An example demonstrates that an estimate of uncertainty based on the standard deviations of an analytical
method gives a value similar to one based on the standard deviations obtained from a control chart. Therefore, the estimation
is both a very useful and also a very cost-effective tool. Though measurement uncertainty cannot replace validation in general,
it is a viable alternative to validation for all methods that will never be used routinely.
Received: 24 May 1996 Accepted: 10 August 1996 相似文献
6.
7.
Kanthen?K?HarikrishnanEmail author Hiroaki?Ishii 《Fuzzy Optimization and Decision Making》2005,4(2):141-147
We consider a batch scheduling problem on a single machine which processes jobs with resource dependent setup and processing time in the presence of fuzzy due-dates given as follows:1. There are n independent non-preemptive and simultaneously available jobs processed on a single machine in batches. Each job j has a processing time and a due-date.2. All jobs in a batch are completed together upon the completion of the last job in the batch. The batch processing time is equal to the sum of the processing times of its jobs. A common machine setup time is required before the processing of each batch.3. Both the job processing times and the setup time can be compressed through allocation of a continuously divisible resource. Each job uses the same amount of the resource. Each setup also uses the same amount of the resource.4. The due-date of each job is flexible. That is, a membership function describing non-decreasing satisfaction degree about completion time of each job is defined.5. Under above setting, we find an optimal batch sequence and resource values such that the total weighted resource consumption is minimized subject to meeting the job due-dates, and minimal satisfaction degree about each due-date of each job is maximized. But usually we cannot optimize two objectives at a time. So we seek non-dominated pairs i.e. the batch sequence and resource value, after defining dominance between solutions.A polynomial algorithm is constructed based on linear programming formulations of the corresponding problems. 相似文献
8.
We study a hybrid transportation system referred to as mobility allowance shuttle transit (MAST) where vehicles may deviate from a fixed path consisting of a few mandatory checkpoints to serve demand distributed within a proper service area. In this paper we propose a mixed integer programming (MIP) formulation for the static scheduling problem of a MAST type system. Since the problem is NP-Hard, we develop sets of logic cuts, by using reasonable assumptions on passengers’ behavior. The purpose of these constraints is to speed up the search for optimality by removing inefficient solutions from the original feasible region. Experiments show the effectiveness of the developed inequalities, achieving a reduction up to 90% of the CPU solving time for some of the instances. 相似文献
9.
In this paper, the economic and economic-statistical design of a χ2 chart for a maintenance application is considered. The machine deterioration process is described by a three-state continuous time Markov chain. The machine state is unobservable, except for the failure state. To avoid costly failures, the system is monitored by a χ2 chart. The observation process stochastically related to the machine condition is assumed to be multivariate, normally distributed. When the chart signals, full inspection is performed to determine the actual machine condition. The system can be preventively replaced at a sampling epoch and must be replaced upon failure; preventive replacement costs less than failure replacement. The objective is to find the optimal control chart parameters that minimize the long-run average maintenance cost per unit time. For the economic-statistical design, an additional constraint guaranteeing the occurrence of the true alarm signal on the chart before failure with given probability is considered. For both designs, the objective function is derived using renewal theory. 相似文献
10.
本文研究了属性间有优先级别关系,各属性有满意度要求的多属性决策问题.利用属性间的优先级别关系和属性的满意度要求来确定低级别的属性对高级别的属性的补偿的大小的方法,获得了一种多属性决策信息集结方法,推广了相关文献的结果,使得决策结果更加符合实际的决策要求. 相似文献