首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
This paper characterizes the second-best mechanism chosen by a benevolent planner under incentive compatibility constraints in queuing problems without monetary transfers. In the absence of monetary compensations, separation between types can only occur if jobs are processed with a probability strictly smaller than one for some configurations of the types. This entails a large efficiency cost, and the planner optimally chooses a pooling contract when types are drawn from a continuous distribution and when binary types are sufficiently close. In the binary model, a separating contract is optimal when the difference between high and low types is large, and results in a low probability of processing jobs when both agents announce high types.  相似文献   

2.
The problem of sequencing jobs on a single machine to minimize total tardiness is considered. An algorithm, which decomposes the problem into subproblems which are then solved by dynamic programming when they are sufficiently small, is presented and is tested on problems with up to 100 jobs.  相似文献   

3.
Bioeconomic analyses of spatial fishery models have established that marine reserves can be economically optimal (i.e., maximize sustainable profit) when there is some type of spatial heterogeneity in the system. Analyses of spatially continuous models and models with more than two discrete patches have also demonstrated that marine reserves can be economically optimal even when the system is spatially homogeneous. In this note we analyze a spatially homogeneous two‐patch model and show that marine reserves can be economically optimal in this case as well. The model we study includes the possibility that fishing can damage habitat. In this model, marine reserves are necessary to maximize sustainable profit when dispersal between the patches is sufficiently high and habitat is especially vulnerable to damage.  相似文献   

4.
We study an infinite-server fork–join queueing system with dependent services, which experiences alternating renewal service disruptions. Jobs are forked into a fixed number of parallel tasks upon arrival and processed at the corresponding parallel service stations with multiple servers. Synchronization of a job occurs when its parallel tasks are completed, i.e., non-exchangeable. Service times of the parallel tasks of each job can be correlated, having a general continuous joint distribution function, and moreover, the service vectors of consecutive jobs form a stationary dependent sequence satisfying the strong mixing (\(\alpha \)-mixing) condition. The system experiences renewal alternating service disruptions with up and down periods. In each up period, the system operates normally, but in each down period, jobs continue to enter the system, while all the servers will stop working, and services received will be conserved and resume at the beginning of the next up period. We study the impact of both the dependence among service times and these down times upon the service dynamics, the unsynchronized queueing dynamics, and the synchronized process, assuming that the down times are asymptotically negligible. We prove FWLLN and FCLT for these processes, where the limit processes in the FCLT possess a stochastic decomposition property and the convergence requires the Skorohod \(M_1\) topology.  相似文献   

5.
In this paper we consider the problem of minimizing number of tardy jobs on a single batch processing machine. The batch processing machine is capable of processing up to B jobs simultaneously as a batch. We are given a set of n jobs which can be partitioned into m incompatible families such that the processing times of all jobs belonging to the same family are equal and jobs of different families cannot be processed together. We show that this problem is NP-hard and present a dynamic programming algorithm which has polynomial time complexity when the number of job families and the batch machine capacity are fixed. We also show that when the jobs of a family have a common due date the problem can be solved by a pseudo-polynomial time procedure.  相似文献   

6.
This paper addresses the problem of scheduling jobs in a single machine with sequence dependent setup times in order to minimize the total tardiness with respect to job due dates. We propose variants of the GRASP metaheuristic that incorporate memory-based mechanisms for solving this problem. There are two mechanisms proposed in the literature that utilize a long-term memory composed of an elite set of high quality and sufficiently distant solutions. The first mechanism consists of extracting attributes from the elite solutions in order to influence the construction of an initial solution. The second one makes use of path relinking to connect a GRASP local minimum with a solution of the elite set, and also to connect solutions from the elite set. Reactive GRASP, which probabilistically determines the degree of randomness in the GRASP construction throughout the iterations, is also investigated. Computational tests for instances involving up to 150 jobs are reported, and the proposed method is compared with heuristic and exact methods from the literature.  相似文献   

7.
The problem addressed in this paper is defined by M parallel identical machines, N jobs with identical (unit) processing time, job-dependent weights, and a common due-date for all jobs. The objective is of a minmax type, i.e. we are interested in minimizing the cost of the worst scheduled job. In the case of a non-restrictive (i.e., sufficiently large) common due-date, the problem is shown to have a solution that is polynomial in the number of jobs. The solution in the case of a restrictive due-date remains polynomial in the number of jobs, but is exponential in the number of machines. We introduce a lower bound on the optimal cost and an efficient heuristic. We show that the worst case relative error of the heuristic is bounded by 2 and that this bound is tight. We also prove that the heuristic is asymptotically optimal under very general assumptions. Finally, we provide an extensive numerical study demonstrating that in most cases the heuristic performs extremely well.  相似文献   

8.
The sequential production of identical jobs and the flow-shop machine setting are extremely common in real-life applications. We study a scheduling problem that combines these two elements: jobs of identical processing time, with job-dependent weights, and a given common due date processed on an m-machine flow-shop. The (just-in-time) objective is to minimize the maximum earliness/tardiness cost. We introduce a polynomial time solution in both cases of (i) a non-restrictive (ie, sufficiently large) due date, and (ii) a restrictive due date (which restricts the number of early jobs).  相似文献   

9.
Discrete–continuous problems of scheduling nonpreemptable jobs on parallel machines are considered. The problems arise e.g. when jobs are assigned to multiple parallel processors driven by a common electric, hydraulic or pneumatic power source. Existing models have assumed job processing rates as a function of the number of jobs currently being processed, or equivalently the number of machines currently in operation. In this paper a more general model is proposed in which processing rates of a job assigned to a machine depend on the amount of a continuous, i.e. continuously divisible resource (e.g. power) allotted to this job at a time. Thus the problem consists of two interrelated subproblems: (i) to sequence jobs on machines, and (ii) to allocate the continuous resource among jobs already sequenced. We provide a comprehensive analysis of the problem. This includes properties of optimal schedules, efficiently (in particular analytically) solvable cases, formulations of the possibly simplest mathematical programming problems for finding optimal schedules in the general case, heuristics and the worst-case analysis. Although our objective function in this paper is to minimize makespan of a set of independent jobs, the presented methodology can be applied to other criteria, precedence-related jobs, and many resource types (apart from, or instead of machines).  相似文献   

10.
考虑多代理的平行分批排序,不同代理的工件不能放在同一批中加工,目标函数是最小化加权误工工件数.本文考虑两种模型,证明了甚至当所有工件具有单位权时,这两个模型都是强NP困难的.但当代理数给定时,这两个问题都可在拟多项式时间解决,并且当工件具有单位权时,可在多项式时间解决.进一步证明当代理数固定时,两个问题都有FPTAS算法.  相似文献   

11.
We consider the problem of scheduling multi-operation jobs on a singe machine to minimize the total completion time. Each job consists of several operations that belong to different families. In a schedule each family of job operations may be processed as batches with each batch incurring a set-up time. A job is completed when all of its operations have been processed. We first show that the problem is strongly NP-hard even when the set-up times are common and each operation is not missing. When the operations have identical processing times and either the maximum set-up time is sufficiently small or the minimum set-up time is sufficiently large, the problem can be solved in polynomial time. We then consider the problem under the job-batch restriction in which the operations of each batch is partitioned into operation batches according to a partition of the jobs. We show that this case of the problem can be solved in polynomial time under a certain condition.  相似文献   

12.
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the machines and the job schedule, such that the total weighted earliness and tardiness cost is minimized. We study both cases of a non-restrictive (i.e. sufficiently late), and a restrictive due-window. For a given number of machines, the solutions of the problems studied here are obtained in polynomial time in the number of jobs.  相似文献   

13.
We study a static stochastic single machine scheduling problem in which jobs have random processing times with arbitrary distributions, due dates are known with certainty, and fixed individual penalties (or weights) are imposed on both early and tardy jobs. The objective is to find an optimal sequence that minimizes the expected total weighted number of early and tardy jobs. The general problem is NP-hard to solve; however, in this paper, we develop certain conditions under which the problem is solvable exactly. An efficient heuristic is also introduced to find a candidate for the optimal sequence of the general problem. Our illustrative examples and computational results demonstrate that the heuristic performs well in identifying either optimal sequences or good candidates with low errors. Furthermore, we show that special cases of the problem studied here reduce to some classical stochastic single machine scheduling problems including the problem of minimizing the expected weighted number of early jobs and the problem of minimizing the expected weighted number of tardy jobs which are both solvable by the proposed exact or heuristic methods.  相似文献   

14.
A job search problem is considered, in which there is a large population of jobs initially available and a large population of searchers. The ratio of the number of searchers to the number of jobs is α. Each job has an associated value from a known distribution. At each of N moments the searchers observe a job, whose value comes from the distribution of the values of currently available jobs. If a searcher accepts a job, s/he ceases searching and the job becomes unavailable. Hence, the distribution of the values of available jobs changes over time. Also, the ratio of the number of those still searching to the number of available jobs changes. The model is presented and Nash equilibrium strategies for such problems are considered. By definition, when all the population use a Nash equilibrium strategy, the optimal response of an individual is to use the same strategy. Conditions are given that ensure the existence of a unique Nash equilibrium strategy. Examples are given to illustrate the model and present different approaches to solving such problems.  相似文献   

15.
We consider supply chain scheduling problems where customers release jobs to a manufacturer that has to process the jobs and deliver them to the customers. The jobs are released on-line, that is, at any time there is no information on the number, release and processing times of future jobs; the processing time of a job becomes known when the job is released. Preemption is allowed. To reduce the total costs, processed jobs are grouped into batches, which are delivered to customers as single shipments; we assume that the cost of delivering a batch does not depend on the number of jobs in the batch. The objective is to minimize the total cost, which is the sum of the total flow time and the total delivery cost. For the single-customer problem, we present an on-line two-competitive algorithm, and show that no other on-line algorithm can have a better competitive ratio. We also consider an extension of the algorithm for the case of m customers, and show that its competitive ratio is not greater than 2m if the delivery costs to different customers are equal.  相似文献   

16.
Scheduling with unexpected machine breakdowns   总被引:1,自引:0,他引:1  
We investigate an online version of a basic scheduling problem where a set of jobs has to be scheduled on a number of identical machines so as to minimize the makespan. The job processing times are known in advance and preemption of jobs is allowed. Machines are non-continuously available, i.e., they can break down and recover at arbitrary time instances not known in advance. New machines may be added as well. Thus machine availabilities change online. We first show that no online algorithm can construct optimal schedules. We also show that no online algorithm can achieve a bounded competitive ratio if there may be time intervals where no machine is available. Then we present an online algorithm that constructs schedules with an optimal makespan of CmaxOPT if a lookahead of one is given, i.e., the algorithm always knows the next point in time when the set of available machines changes. Finally, we give an online algorithm without lookahead that constructs schedules with a nearly optimal makespan of CmaxOPT+, for any >0, if at any time at least one machine is available. Our results demonstrate that not knowing machine availabilities in advance is of little harm.  相似文献   

17.
We consider a scheduling model in which several batches of jobs need to be processed by a single machine. During processing, a setup time is incurred whenever there is a switch from processing a job in one batch to a job in another batch. All the jobs in the same batch have a common due date that is either externally given as an input data or internally determined as a decision variable. Two problems are investigated. One problem is to minimize the total earliness and tardiness penalties provided that each due date is externally given. We show that this problem is NP-hard even when there are only two batches of jobs and the two due dates are unrestrictively large. The other problem is to minimize the total earliness and tardiness penalties plus the total due date penalty provided that each due date is a decision variable. We give some optimality properties for this problem with the general case and propose a polynomial dynamic programming algorithm for solving this problem with two batches of jobs. We also consider a special case for both of the problems when the common due dates for different batches are all equal. Under this special case, we give a dynamic programming algorithm for solving the first problem with an unrestrictively large due date and for solving the second problem. This algorithm has a running time polynomial in the number of jobs but exponential in the number of batches.  相似文献   

18.
The relocation problem addressed in this paper is to determine a reconstruction sequence for a set of old buildings, under a limited budget, such that there is adequate temporary space to house the residents decanted during rehabilitation. It can be regarded as a resource-constrained scheduling problem where there is a set of jobs to be processed on a single machine. Each job demands a number of resources for processing and returns probably a different number of resources on its completion. Given a number of initial resources, the problem seeks to determine if there is a feasible sequence for the successful processing of all the jobs. Two generalizations of the relocation problem in the context of single machine scheduling with due date constraints are studied in this paper. The first problem is to minimize the weighted number of tardy jobs under a common due date. We show that it is NP-hard even when all the jobs have the same tardy weight and the same resource requirement. A dynamic programming algorithm with pseudo-polynomial computational time is proposed for the general case. In the second problem, the objective is to minimize the maximum tardiness when each job is associated with an individual due date. We prove that it is strongly NP-hard. We also propose a pseudo-polynomial time dynamic programming algorithm for the case where the number of possible due dates is predetermined.  相似文献   

19.
This paper is concerned with a study of the classical isoperimetric problem modified by an addition of a nonlocal repulsive term. We characterize existence, nonexistence, and radial symmetry of the minimizers as a function of mass in the situation where the nonlocal term is generated by a kernel given by an inverse power of the distance. We prove that minimizers of this problem exist for sufficiently small masses and are given by disks with prescribed mass below a certain threshold when the interfacial term in the energy is dominant. At the same time, we prove that minimizers fail to exist for sufficiently large masses due to the tendency of the low‐energy configuration to split into smaller pieces when the nonlocal term in the energy is dominant. In the latter regime, we also establish linear scaling of energy with mass, suggesting that for large masses low‐energy configurations consist of many roughly equal‐size pieces far apart. In the case of slowly decaying kernels, we give a complete characterization of the minimizers. © 2012 Wiley Periodicals, Inc.  相似文献   

20.
Hjálmtýsson  Gísli  Whitt  Ward 《Queueing Systems》1998,30(1-2):203-250
Multiprocessor load balancing aims to improve performance by moving jobs from highly loaded processors to more lightly loaded processors. Some schemes allow only migration of new jobs upon arrival, while other schemes allow migration of jobs in progress. A difficulty with all these schemes, however, is that they require continuously maintaining detailed state information. In this paper we consider the alternative of periodic load balancing, in which the loads are balanced only at each T time units for some appropriate T. With periodic load balancing, state information is only needed at the balancing times. Moreover, it is often possible to use slightly stale information collected during the interval between balancing times. In this paper we study the performance of periodic load balancing. We consider multiple queues in parallel with unlimited waiting space to which jobs come either in separate independent streams or by assignment (either random or cyclic) from a single stream. Resource sharing is achieved by periodically redistributing the jobs or the work in the system among the queues. The performance of these systems of queues coupled by periodic load balancing depends on the transient behavior of a single queue. We focus on useful approximations obtained by considering a large number of homogeneous queues and a heavy load. When the number of queues is sufficiently large, the number of jobs or quantity of work at each queue immediately after redistribution tends to evolve deterministically, by the law of large numbers. The steady-state (limiting) value of this deterministic sequence is obtained as the solution of a fixed point equation, where the initial value is equal to the expected transient value over the interval between successive redistributions conditional on the initial value. A refined approximation based on the central limit theorem is a normal distribution, where the mean and variance are obtained by solving a pair of fixed-point equations. With higher loads, which is natural to consider when load balancing is performed, a heavy-traffic limit theorem shows that one-dimensional reflected Brownian motion can be used to approximately describe system performance, even with general arrival and service processes. With these approximations, we show how performance depends on the assumed arrival pattern of jobs and the model parameters. We do numerical calculations and conduct simulation experiments to show the accuracy of the approximations. This revised version was published online in June 2006 with corrections to the Cover Date.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号