首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
We study coordination mechanisms for scheduling n jobs on m parallel machines where agents representing the jobs interact to generate a schedule. Each agent acts selfishly to minimize the completion time of his/her own job, without considering the overall system performance that is measured by a central objective. The performance deterioration due to the lack of a central coordination, the so-called price of anarchy, is determined by the maximum ratio of the central objective function value of an equilibrium schedule divided by the optimal value. In the first part of the paper, we consider a mixed local policy with some machines using the SPT rule and other machines using the LPT rule. We obtain the exact price of anarchy for the problem of minimizing the makespan and some bounds for the problem of minimizing the total completion time. In the second part of the paper, we consider parallel machine scheduling subject to eligibility constraints. We devise new local policies based on the flexibilities and the processing times of the jobs. We show that the newly devised local policies outperform both the SPT and the LPT rules.  相似文献   

2.
研究工件延误产生干扰且延误工件可拒绝下的单机重新排序问题。在该问题中,给定计划在零时刻到达的一个工件集需在一台机器上加工,工件集中的每个工件有它的加工时间和权重,在工件正式开始加工前,按照最短赋权加工时间优先的初始排序已经给定,目标函数是极小化赋权完工时间和,据此每个工件的承诺交付截止时间也给定。然而,在工件正式开始加工时,工件集中的部分工件由于延误不能按时到达,这对初始排序的执行产生了干扰,所以需要对初始排序进行调整,即重新排序。为了保证服务水平,允许对延误工件拒绝加工,但需支付相应的拒绝费用。调整后的重新排序的目标是在保证接受工件集中工件的最大延误不超过给定的上界的约束下,使得接受工件集的赋权完工时间和,拒绝工件集的拒绝费用和以及接受工件集中工件的最大延误的赋权惩罚费用之和达到极小。对该问题,设计了一个伪多项式时间动态规划精确算法,并利用稀疏技术得到了一个完全多项式时间近似方案。  相似文献   

3.
本文考虑了机器具有不可用区间且工件可拒绝下的单机重新排序问题,在该问题中,给定一个工件集需在一台机器上加工,每个工件有自己的加工时间和权重,且对该工件集目标函数为极小化总加权完工时间的排序计划已给定,根据该排序计划中每个工件的完工时间已确定每个工件的承诺交付时间。然而,在工件正式开始加工前,原计划用于加工的某段时间区间因临时用于检修机器而导致机器在该时间区间不再可用,需要对工件重新排序。为了确保在新的重新排序中,工件的延误成本不致太大,决策者可以选择拒绝部分工件,但需支付相应的拒绝费用。任务是确定接受工件集和拒绝工件集,并将接受的工件在考虑机器具有不可用区间的条件下重新排序使得接受工件集的总加权完工时间,总拒绝费用及赋权最大延误之和最小。该问题是NP-困难的,对此给出了伪多项式时间动态规划精确算法,利用稀疏技术设计了完全多项式时间近似方案。  相似文献   

4.
Each of n jobs is to be processed without interruption on a single machine. Each job becomes available for processing at time zero. The objective is to find a processing order of the jobs which minimizes the sum of weighted completion times added with maximum weighted tardiness. In this paper we give a general case of the theorem that given in [6]. This theorem shows a relation between the number of efficient solutions, lower bound LB and optimal solution. It restricts the range of the lower bound, which is the main factor to find the optimal solution. Also, the theorem opens algebraic operations and concepts to find new lower bounds.  相似文献   

5.
We consider several single machine scheduling problems in which the processing time of a job is a linear function of its starting time and jobs can be rejected by paying penalties. The objectives are to minimize the makespan, the total weighted completion time and the maximum lateness/tardiness plus the total penalty of the rejected jobs. We show that these problems are NP-hard, and design algorithms based on dynamic programming (including pseudo-polynomial time optimal algorithms and fully polynomial time approximation schemes) to solve them.  相似文献   

6.
There is a fabrication machine available for processing a set of jobs. Each job is associated with a due date and consists of two parts, one is common among all products and the other is unique to itself. The unique components are processed individually and the common parts are grouped into batches for processing. A constant setup time is incurred when each batch is formed. The completion time of a job is defined as the time when both of its unique and common components are completed. In this paper, we consider two different objectives. The first problem seeks to minimize the maximum tardiness, and the second problem is to minimize the number of tardy jobs. To minimize the maximum tardiness, we propose a dynamic programming algorithm that optimally solves the problem in polynomial time. Next, we show NP-hardness proof and design a pseudo-polynomial time dynamic programming algorithm for the problem of minimizing the number of tardy jobs.  相似文献   

7.
张龙 《运筹学学报》2017,21(2):126-134
研究一类储存时间有上限的两阶段供应链排序问题.两阶段是指工件先加工,后运输:加工阶段是一台加工机器逐个加工工件;运输阶段是无限台车辆分批运输完工的工件.工件的运输完成时刻与完工时刻之差定义为工件的储存时间,且有相应的储存费用,且任意工件的储存时间都不超过某一常数.若工件的运输完成时刻早于(晚于)交货期窗口的开始(结束)时刻,则有相应的提前(延误)惩罚费用.目标是极小化总提前惩罚费用、总延误惩罚费用、总储存费用、总运输费用以及与交货期窗口有关的费用之和.先证明该问题是NP-难的,后对单位时间的储存费用不超过单位时间的延误惩罚费用的情形给出了伪多项式时间算法.  相似文献   

8.
研究一类优化交货期窗口的两阶段供应链排序问题. 优化交货期窗口是指交货期窗口的开始与结束时刻是决策变量, 不是输入常量. 两阶段是指工件先加工, 后运输: 加工阶段是一台加工机器逐个加工工件;运输阶段是无限台车辆分批运输完工的工件. 工件的开始运输时刻与完工时刻之差定义为工件的储存时间, 且有相应的储存费用. 若工件的运输完成时刻早于(晚于)交货期窗口的开始(结束)时刻, 则有相应的提前(延误)惩罚费用. 目标是极小化总提前惩罚费用、总延误惩罚费用、总储存费用、总运输费用以及与交货期窗口有关的费用之和. 针对单位时间的延误惩罚费用不超过单位时间的储存费用、单位时间的储存费用不超过单位时间的提前惩罚费用的情形, 给出了时间复杂性为O(n^{8})的动态规划算法.  相似文献   

9.
We consider a single resource that performs a set of jobs, each job being defined by its operation time and its due date. Jobs are not preemptive, which means that a job that starts cannot be interrupted before completion. These jobs have been scheduled so as to minimize the total tardiness, and the schedule is known.  相似文献   

10.
We study problems of scheduling n unit-time jobs on m identical parallel machines, in which a common due window has to be assigned to all jobs. If a job is completed within the due window, then no scheduling cost incurs. Otherwise, a job-dependent earliness or tardiness cost incurs. The job completion times, the due window location and the size are integer valued decision variables. The objective is to find a job schedule as well as the location and the size of the due window such that a weighted sum or maximum of costs associated with job earliness, job tardiness and due window location and size is minimized. We establish properties of optimal solutions of these min-sum and min-max problems and reduce them to min-sum (traditional) or min-max (bottleneck) assignment problems solvable in O(n 5/m 2) and O(n 4.5log0.5 n/m 2) time, respectively. More efficient solution procedures are given for the case in which the due window size cost does not exceed the due window start time cost, the single machine case, the case of proportional earliness and tardiness costs and the case of equal earliness and tardiness costs.  相似文献   

11.
并行分批排序起源于半导体芯片制造过程。在并行分批排序中,工件可成批加工,批加工机器最多可同时加工B个工件,批的加工时间为批中所有工件的最大工时。首先根据传统的机器环境和目标函数对并行分批排序已有成果进行分类介绍,主要为单机和平行机的机器环境,以及极小化最大完工时间、极小化总完工时间、极小化最大延迟、极小化误工工件数、极小化总延误和极小化最大延误的目标函数;然后梳理了由基本问题所衍生出来的具有新特点的16类新型并行分批排序,包括差异尺寸工件、多目标、工件加工时间或顺序存在限制、考虑费用和具有特殊机制等情况;最后展望未来的研究方向。  相似文献   

12.
We consider parallel-machine job scheduling problems with precedence constraints. Job processing times are variable and depend on positions of jobs in a schedule. The objective is to minimize the maximum completion time or the total weighted completion time. We specify certain conditions under which the problem can be solved by scheduling algorithms applied earlier for fixed job processing times.  相似文献   

13.
In this paper, we present new approximation results for the offline problem of single machine scheduling with sequence-independent set-ups and item availability, where the jobs to be scheduled are independent (i.e., have no precedence constraints) and have a common release time.We present polynomial-time approximation algorithms for two versions of this problem. In the first version, the input includes a weight for each job, and the goal is to minimize the total weighted completion time. On any input, our algorithm produces a schedule whose total weighted completion time is within a factor 2 of optimal for that input.In the second version, the input includes a due date for each job, and the goal is to minimize the maximum lateness of any job. On any input, our algorithm produces a schedule with the following performance guarantee: the maximum lateness of a job is at most the maximum lateness of the optimal schedule on a machine that runs at half the speed of our machine.  相似文献   

14.
In many realistic scheduling settings a job processed later consumes more time than when it is processed earlier – this phenomenon is known as scheduling with deteriorating jobs. In the literature on deteriorating job scheduling problems, majority of the research assumed that the actual job processing time of a job is a function of its starting time. In this paper we consider a new deterioration model where the actual job processing time of a job is a function of the processing times of the jobs already processed. We show that the single-machine scheduling problems to minimize the makespan and total completion time remain polynomially solvable under the proposed model. In addition, we prove that the problems to minimize the total weighted completion time, maximum lateness, and maximum tardiness are polynomially solvable under certain agreeable conditions.  相似文献   

15.
In this paper we consider the single machine past-sequence-dependent (p-s-d) setup times scheduling problems with general position-dependent and time-dependent learning effects. By the general position-dependent and time-dependent learning effects, we mean that the actual processing time of a job is not only a function of the total normal processing times of the jobs already processed, but also a function of the job’s scheduled position. The setup times are proportional to the length of the already processed jobs. We consider the following objective functions: the makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times, the total lateness, the total weighted completion time, the maximum lateness, the maximum tardiness and the number of tardy jobs. We show that the problems of makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times and the total lateness can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem, the maximum lateness minimization problem, maximum tardiness minimization problem and the number of tardy jobs minimization problem can be solved in polynomial time under certain conditions.  相似文献   

16.
We consider uniform parallel machine scheduling problems with unit-length jobs where every job is only allowed to be processed on a specified subset of machines. We develop efficient methods to solve problems with various objectives, including minimizing a total tardiness function, a maximum tardiness function, total completion time, the number of tardy jobs, the makespan, etc.  相似文献   

17.
We study the problem of scheduling N independent jobs in a job-shop environment. Each job must be processed on M machines according to individual routes. The objective is to minimize the maximum completion time of the jobs. First, the job-shop problem is reduced to a flow-shop problem with job precedence constraints. Then, a set of flow-shop algorithms are modified to solve it. To evaluate the quality of these heuristics, several lower bounds on the optimal solution have been computed and compared with the heuristic solutions for 3040 problems. The heuristics appear especially promising for job-shop problems with ‘flow-like’ properties.  相似文献   

18.
We consider parallel machine scheduling problems where the processing of the jobs on the machines involves two types of objectives. The first type is one of two classical objective functions in scheduling theory: either the total completion time or the makespan. The second type involves an actual cost associated with the processing of a specific job on a given machine; each job-machine combination may have a different cost. Two bi-criteria scheduling problems are considered: (1) minimize the maximum machine cost subject to the total completion time being at its minimum, and (2) minimize the total machine cost subject to the makespan being at its minimum. Since both problems are strongly NP-hard, we propose fast heuristics and establish their worst-case performance bounds.  相似文献   

19.
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the machines and the job schedule, such that the total weighted earliness and tardiness cost is minimized. We study both cases of a non-restrictive (i.e. sufficiently late), and a restrictive due-window. For a given number of machines, the solutions of the problems studied here are obtained in polynomial time in the number of jobs.  相似文献   

20.
多任务调度问题存在于各种应用领域,如因特网服务领域,医疗领域等。经典的多任务调度模型中所有工件均可被其他等待工件打扰,且仅打扰一次。然而在生产实践过程中,有些紧急工件是不允许被其他工件打扰。在此启发下,对原有模型进行扩展,研究了在单机多任务环境下部分工件不可打扰的调度问题,模型目标包括最小化最大完工时间,最小化总完工时间,最小化最大延迟以及最小化加权提前期、拖延期和共同交货期之和。对于前三个目标给出了精确算法,对于最后一个目标给出了启发式算法。最后,对今后的研究提出了建议。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号