首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 703 毫秒
1.
In this paper we consider the problem of scheduling a set of simultaneously available jobs on several parallel and identical machines. The problem is to find the optimal due-date, assuming this to be the same for all jobs. We also seek to sequence the jobs such that some are early and some are late so as to minimize a penalty function. For the single-machine problem, we present a simple proof of the well-known optimality result that the optimal due-date coincides with one of the job completion times. We show that the optimal job sequence for the single-machine problem can be easily determined. We prove that the same optimal due-date result can be generalized to the parallel-machine problem. However, determination of the optimal job sequence for such a problem is much more complex, and we present a simple heuristic to find an approximate solution. On the basis of a limited experiment, we observe that the heuristic is very effective in obtaining near-optimal solutions.  相似文献   

2.
We study a single-machine scheduling problem with the objective of minimizing a linear combination of total job completion times and total deviation of job completion times from a common due-date. The due-date is assumed to be restrictive, i.e., it may be sufficiently small to have an impact on the optimal sequence. When more weight is allocated to total job completion times, the problem is shown to have a polynomial time solution. When more weight is allocated to total completion time deviations from the due-date, the problem is NP-hard in the ordinary sense. For the latter case, we introduce an efficient dynamic programming algorithm, which is shown numerically to perform well in all our tests.  相似文献   

3.
We study a scheduling problem with deteriorating jobs, that is, jobs whose processing times are an increasing function of their start times. We consider the case of a single machine and linear job-independent deterioration. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of due-date, earliness and tardiness penalties. We give an O(n log n) time algorithm to solve this problem.  相似文献   

4.
Single-machine scheduling to minimize earliness and number of tardy jobs   总被引:1,自引:0,他引:1  
This paper considers the problem of assigning a common due-date to a set of simultaneously available jobs and sequencing them on a single machine. The objective is to determine the optimal combination of the common due-date and job sequence that minimizes a cost function based on the assigned due-date, job earliness values, and number of tardy jobs. It is shown that the optimal due-date coincides with one of the job completion times. Conditions are derived to determine the optimal number of nontardy jobs. It is also shown that the optimal job sequence is one in which the nontardy jobs are arranged in nonincreasing order of processing times. An efficient algorithm of O(n logn) time complexity to find the optimal solution is presented and an illustrative example is provided. Finally, several extensions of the model are discussed.This research was supported in part by the Natural Sciences and Engineering Research Council of Canada under Grant OPG0036424. The authors are thankful to two anonymous referees for their constructive comments.  相似文献   

5.
《Applied Mathematical Modelling》2014,38(7-8):2063-2072
In real manufacturing environments, some customer orders include multiple jobs. However, a single due-date should be assigned to each order. Further, machine processing rate is not constant at all times. In effect, in many manufacturing operations, the machine processing rate decreases to a subnormal level during time and needs a special type of maintenance to bring the normal state back. Due to this reduction in capacity, production schedulers may decide to reject some orders. In this paper, the novel extensive problem of selecting a subset of orders, assigning due-dates to selected orders, scheduling the selected orders and jobs within each one, and scheduling the rate-modifying maintenance is studied. The objective function is minimizing total cost of lost-sales of rejected orders together with due-date length and maximum of earliness and tardiness of selected orders. The problem is proved polynomial and an optimal approach is developed.  相似文献   

6.
In a recent paper, Cheng considers the multiple-machine extension to a due-date assignment and scheduling problem. He implicitly assumes zero start times for all schedules (which does not ensure optimality), and overlooks the critical V-shape property for an optimal schedule (which leads him to over-estimate the effort needed to solve the problem). In this note, we correct these flaws, and also discuss the complexity of the problem and its special cases.  相似文献   

7.
This note considers the n-job, one-machine scheduling problem with common due-dates. Previous research has shown that the optimal value of the common due-date coincides with one of the job completion times for a given job sequence. In this note, we propose a linear programming (L.P.) formulation of the problem and obtain the same optimal result via considering the L.P. dual problem.  相似文献   

8.
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job's processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuristic algorithm to find near-optimal solutions for the problem. When the due-date penalty is 0, we present a polynomial time algorithm to solve it.  相似文献   

9.
This paper focuses on the single machine sequencing and common due-date assignment problem for the objective of minimizing the sum of the penalties associated with earliness, tardiness and due-date assignment. Unlike the previous research articles on this class of scheduling problem, we consider sequence-dependent setup times that make the problem much more difficult. To solve the problem, a branch and bound algorithm, which incorporates the method to obtain lower and upper bounds as well as a dominance property to reduce the search space, is suggested that gives the optimal solutions for small-sized instances. Heuristic algorithms are suggested to obtain solutions for large-sized problems within a reasonable computation time. The performances of both the optimal and heuristic algorithms, in computational experiments on randomly generated test instances, are reported.  相似文献   

10.
We study the dynamic due-date setting problem where the objective is to improve delivery performance. Since the problem is NP-hard, we propose a simple, new, general, heuristic due-date setting procedure called the SL rule. For the classical M/M/1 queuing model, we analytically determine the optimum parameter for the proposed rule to achieve best due-date performance. We then show that the optimized SL rule outperforms the work-content-based TWK rule in terms of fraction tardy, mean tardiness, and mean earliness. Additional numerical and simulation analysis for a range of conditions, covering different shop workload levels and priority regimes, confirms that the proposed rule produces best due-date performance, compared to the work-content-based rule, under most of the conditions studied.  相似文献   

11.
Due-data determination problems have gained significant attention in recent years due to the industrial focus in the just-in-time philosophy. In this paper the problem of scheduling a set of independent jobs on parallel unrelated processors under a common due-date is examined. The common due-date is a decision variable. The objective is to allocate and sequence the jobs on the machines and to determine the optimal due-data, so that the total cost be minimised. This cost is composed of the due-date assignment, the total earliness and the total tardiness cost. As the problem is NP-hard, a polynomial time heuristic procedure, which provides efficient solutions, is developed. The procedure is illustrated by means of an example and is tested via two small size experiments.  相似文献   

12.
This paper studies the problem of simultaneous due-date determination and sequencing of a set of n jobs on a single machine where processing times are random variables and job earliness and tardiness costs are distinct. The objective is to determine the optimal sequence and the optimal due-dates which jointly minimize the expected total earliness and tardiness cost. We present an analytical approach to determine optimal due-dates, and propose two efficient heuristics of order O(n log n) to find candidates for the optimal sequence. It is demonstrated that variations in processing times increase cost and affect sequencing and due-date determination decisions. Our illustrative examples as well as computational results show that the proposed model produces optimal sequences and optimal due-dates that are significantly different from those provided by the classical deterministic single machine models. Furthermore, our computational experiments reveal that the proposed heuristics perform well in providing either optimal sequences or good candidates with low overcosts.  相似文献   

13.
Due-date assignment and maintenance activity scheduling problem   总被引:1,自引:0,他引:1  
In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent factor. The objective is minimum total earliness, tardiness and due-date cost. We introduce a polynomial (O(n4)) solution for the problem.  相似文献   

14.
Single-machine scheduling with both deterioration and learning effects   总被引:1,自引:0,他引:1  
This paper considers a single-machine scheduling problem with both deterioration and learning effects. The objectives are to respectively minimize the makespan, the total completion times, the sum of weighted completion times, the sum of the kth power of the job completion times, the maximum lateness, the total absolute differences in completion times and the sum of earliness, tardiness and common due-date penalties. Several polynomial time algorithms are proposed to optimally solve the problem with the above objectives.  相似文献   

15.
The job-shop due-date assignment problem arises when a manager needs to ‘promise’ a delivery date to a customer. Previous methods yield due-dates which are either optimistic (unlikely to be achieved) or conservative (the promise will be met, but too easily, because the date given was very pessimistic). This paper investigates the due-date assignment problem with a customer ‘service-level’ constraint, the percentage of time that promised delivery dates are honoured. We formulate a rule to attain this service level, yet maintain as short a due-date lead time as possible. Unlike previous attempts, this due-date rule considers not only the job content and instantaneous shop congestion information, but also implicitly incorporates information on how the jobs will be scheduled (or ‘loaded’) once they are in the shop. We simulate a single-machine shop for various measures of performance under several dispatching priorities, comparing our due-date rule with one reported to yield satisfactory performance. Our rule meets all requirements and is found to be superior for most measures of performance.  相似文献   

16.
This paper concerns a due-date matching problem in a single-stage manufacturing system. Given a finite sequence of jobs and their service order, and given the delivery due date of each job, the problem is to choose the jobs release (arrival) times so as to match as closely as possible their completion times to their respective due dates. The system is modelled as a deterministic single-server FIFO queue with an output buffer for storing jobs whose service is completed prior to their due dates. The output buffer has a finite capacity; when it is full, the server is being blocked. Associated with each job there is a convex cost function penalizing its earliness as well as tardiness. The due-date matching problem is cast as an optimal control problem, whose objective is to minimize the sum of the above cost functions by the choice of the jobs arrival (release) times. Time-box upper-bound and lower-bound constraints are imposed on the jobs output (delivery) times. The optimal-control setting brings to bear on the development of fast and efficient algorithms having intuitive geometric appeal and potential for online implementation.Communicated by W. B. GongResearch supported in part by the National Science Foundation under Grant ECS-9979693 and by the Georgia Tech Manufacturing Research Center under Grant B01-D06.  相似文献   

17.
A linear-programming model to find the optimal ‘CON due-date’ is considered for n independent jobs to be processed on a single machine. The term ‘CON due-date’ stands for constant-allowance due-date, where each job receives exactly the same due-date. The measure of performance considered is a more generalized version of similar problems studied earlier. Duality theory is used to obtain an optimal solution. Some earlier studies are shown to be special cases of the model studied in this paper. Numerical examples are presented for better understanding.  相似文献   

18.
Given a set of n independent jobs to be processed on a singlemachine, the problem is to determine the optimal constant flowallowance for the CON due-date assignment method and the optimaljob sequence to minimize an average missed due-date cost. Alinear programming formulation of the problem is proposed andthe optimal due-date is obtained by solving the LP dual problem.It is shown that the optimal job sequence can be determinedanalytically only under a special circumstance. Finally, a numericalexample is given to demonstrate how the results can be appliedto find the optimal solutions.  相似文献   

19.
This paper considers the problem of determining operation and maintenance schedules for a containership equipped with various subsystems during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies working time of each subsystem, determines the due-date of each maintenance activity and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are subsystem requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the complexity of the problem, we suggest a heuristic algorithm that minimizes the sum of earliness and tardiness between the due-date and the actual start time for each maintenance activity. Computational experiments were done on various test instances and the results are reported. In particular, a case study was done on a real instance and a significant amount of improvement is reported over the experience based conventional method.  相似文献   

20.
The classical single-machine scheduling and due-date assignment problem of Panwalker et al. [Panwalker, S.S., Smith, M.L., Seidmann, A., 1982. Common due date assignment to minimize total penalty for the one machine scheduling problem. Operations Research 30(2) (1982) 391–399] is the following: All n jobs share a common due-date, which is to be determined. Jobs completed prior to or after the due-date are penalized according to a cost function which is linear and job-independent. The objective is to minimize the total earliness–tardiness and due-date cost. We study a generalized version of this problem in which: (i) the earliness and tardiness costs are allowed to be job dependent and asymmetric and (ii) jobs are processed on parallel identical machines. We focus on the case of unit processing-time jobs. The problem is shown to be solved in polynomial (O(n4)) time. Then we study the special case with no due-date cost (a classical problem known in the literature as TWET). We introduce an O(n3) solution for this case. Finally, we study the minmax version of the problem, (i.e., the objective is to minimize the largest cost incurred by any of the jobs), which is shown to be solved in polynomial time as well.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号