首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
A comparison of local search methods for flow shop scheduling   总被引:1,自引:0,他引:1  
Local search techniques are widely used to obtain approximate solutions to a variety of combinatorial optimization problems. Two important categories of local search methods are neighbourhood search and genetic algorithms. Commonly used neighbourhood search methods include descent, threshold accepting, simulated annealing and tabu search. In this paper, we present a computational study that compares these four neighbourhood search methods, a genetic algorithm, and a hybrid method in which descent is incorporated into the genetic algorithm. The performance of these six local search methods is evaluated on the problem of scheduling jobs in a permutation flow shop to minimize the total weighted completion time. Based on the results of extensive computational tests, simulated annealing is found to generate better quality solutions than the other neighborhood search methods. However, the results also indicate that the hybrid genetic descent algorithm is superior to simulated annealing.  相似文献   

2.
We consider the bicriteria scheduling problem of minimizing the number of tardy jobs and average flowtime on a single machine. This problem, which is known to be NP-hard, is important in practice, as the former criterion conveys the customer’s position, and the latter reflects the manufacturer’s perspective in the supply chain. We propose four new heuristics to solve this multiobjective scheduling problem. Two of these heuristics are constructive algorithms based on beam search methodology. The other two are metaheuristic approaches using a genetic algorithm and tabu-search. Our computational experiments indicate that the proposed beam search heuristics find efficient schedules optimally in most cases and perform better than the existing heuristics in the literature.  相似文献   

3.
A composite algorithm is developed for the classical problem of scheduling independent jobs on identical parallel machines with the objective of minimizing the makespan. The algorithm at first obtains a family of initial partial solutions and combines these partial solutions until a feasible solution is generated. Then local search procedures are used for improving the solution. The effectiveness of this approach is evaluated through extensive computational comparisons with recent improvement heuristics for different classes of benchmark instances.  相似文献   

4.
The unconstrained binary quadratic programming problem (BQP) is known to be NP-hard and has many practical applications. This paper presents a simulated annealing (SA)-based heuristic for the BQP. The new SA heuristic for the BQP is based on a simple (1-opt) local search heuristic and designed with a simple cooling schedule, but the multiple annealing processes are adopted. To show practical performances of the SA, we test on publicly available benchmark instances of large size ranging from 500 to 2500 variables and compare them with other heuristics such as multi-start local search, the previous SA, tabu search, and genetic algorithm incorporating the 1-opt local search. Computational results indicate that our SA leads to high-quality solutions with short times and is more effective than the competitors particularly for the largest benchmark set. Furthermore, the values of new best-known solutions found by the SA for several large instances are also reported.  相似文献   

5.
Producing clear and intelligible layouts of hierarchical digraphs knows a renewed interest in information visualization. Recent experimental results show that metaheuristics are well-adapted methods for this problem. In this paper, we develop a new Hybridized Genetic Algorithm for arc crossing minimization. It follows the basic scheme of a GA with two major differences: problem-based crossovers adapted from ordering GAs are combined with a local search strategy based on averaging heuristics. Computational testing was performed on a set of 180 random hierarchical digraphs of standard sizes with various structures. Results show that the Hybridized Genetic Algorithm significantly outperforms Tabu Search—which is one of the best known methods for this problem- and also a multi-start descent except for highly connected graphs.  相似文献   

6.
A derivative-free simulated annealing driven multi-start algorithm for continuous global optimization is presented. We first propose a trial point generation scheme in continuous simulated annealing which eliminates the need for the gradient-based trial point generation. We then suitably embed the multi-start procedure within the simulated annealing algorithm. We modify the derivative-free pattern search method and use it as the local search in the multi-start procedure. We study the convergence properties of the algorithm and test its performance on a set of 50 problems. Numerical results are presented which show the robustness of the algorithm. Numerical comparisons with a gradient-based simulated annealing algorithm and three population-based global optimization algorithms show that the new algorithm could offer a reasonable alternative to many currently available global optimization algorithms, specially for problems requiring ‘direct search’ type algorithm.  相似文献   

7.
This paper presents several procedures for developing non-delay schedules for a permutation flow shop with family setups when the objective is to minimize total earliness and tardiness. These procedures consist of heuristics that were found to be effective for minimizing total tardiness in flow shops without family setups, modified to consider family setups and the total earliness and tardiness objective. These procedures are tested on several problem sets with varying conditions. The results show that variable greedy algorithms are effective when solving small problems, but using a genetic algorithm that includes a neighbourhood defined by the sequence of batches of jobs belonging to the same set-up family is effective when solving medium- or large-sized problems. The results also show that if setup times can be reduced a significant reduction in total earliness and tardiness could result.  相似文献   

8.
介绍了一个求解有时间窗的车辆路径问题(vehicle routing problem with time windows,VRPTW)的启发式算法——基于λ-交换的局部下降搜索算法(Local search descent method based on λ-interchange).VRPTW是指合理安排车辆行驶路线,为一组预先设定有时间限制的客户运送货物,在不违反时间要求和车辆容量限制的条件下使得成本最小.它是一个典型的NP-难题,可以通过启发式算法获得近优解来解决.通过两个实验验证,显示了局部下降搜索算法的优良性能,取得了很好的效果,可以作为进一步研究复杂算法的基础.  相似文献   

9.
This paper presents a hybrid iterated local search (ILS) algorithm for the maximum weight independent set (MWIS) problem, a generalization of the classical maximum independent set problem. Two efficient neighborhood structures are proposed and they are explored using the variable neighborhood descent procedure. Moreover, we devise a perturbation mechanism that dynamically adjusts the balance between intensification and diversification during the search. The proposed algorithm was tested on two well-known benchmarks (DIMACS-W and BHOSLIB-W) and the results obtained were compared with those found by state-of-the-art heuristics and exact methods. Our heuristic outperforms the best-known heuristic for the MWIS as well as the best heuristics for the maximum weight clique problem. The results also show that the hybrid ILS was capable of finding all known optimal solutions in milliseconds.  相似文献   

10.
The allocation of fresh produce to shelf space represents a new decision support research area which is motivated by the desire of many retailers to improve their service due to the increasing demand for fresh food. However, automated decision making for fresh produce allocation is challenging because of the very short lifetime of fresh products. This paper considers a recently proposed practical model for the problem which is motivated by our collaboration with Tesco. Moreover, the paper investigates heuristic and meta-heuristic approaches as alternatives for the generalized reduced gradient algorithm, which becomes inefficient when the problem size becomes larger. A simpler single-item inventory problem is firstly studied and solved by a polynomial time bounded procedure. Several dynamic greedy heuristics are then developed for the multi-item problem based on the procedure for the single-item inventory problem. Experimental results show that these greedy heuristics are much more efficient and provide competitive results when compared to those of a multi-start generalized reduced gradient algorithm. In order to further improve the solution, we investigated simulated annealing, a greedy randomized adaptive search procedure and three types of hyper-heuristics. Their performance is tested and compared on a set of problem instances which are made publicly available for the research community.  相似文献   

11.
Problems of scheduling non-preemptable, independent jobs on parallel identical machines under an additional continuous renewable resource to minimize the makespan are considered. Each job simultaneously requires for its processing a machine and an amount (unknown in advance) of the continuous resource. The processing rate of a job depends on the amount of the resource allotted to this job at a time. The problem is to find a sequence of jobs on machines and, simultaneously, a continuous resource allocation that minimize the makespan. A heuristic procedure for allocating the continuous resource is used. The tabu search metaheuristic to solve the considered problem is presented. The results produced by tabu search are compared with optimal solutions for small instances, as well as with the results generated by simple search methods – multi-start iterative improvement and random sampling for larger instances.  相似文献   

12.
We consider two problems of m-machine flow shop scheduling in this paper: one, with the objective of minimizing the variance of completion times of jobs, and the other with the objective of minimizing the sum of squares of deviations of job completion times from a common due date. Lower bounds on the sum of squares of deviations of job completion times from the mean completion time of jobs for a given partial sequence are first presented. Using these lower bounds, a branch and bound algorithm based on breadth-first search procedure for scheduling n jobs on m-machines with the objective of minimizing completion time variance (CTV) is developed to obtain the best permutation sequence. We also present two lower bounds and thereafter, a branch and bound algorithm with the objective of minimizing the sum of squares of deviations of job completion times from a given common due date (called the MSD problem). The computational experience with the working of the two proposed branch and bound algorithms is also reported. Two heuristics, one for each of the two problems, are developed. The computational experience on the evaluation of the heuristics is discussed.  相似文献   

13.
In this paper, we consider a parallel machine scheduling problem to minimize the total completion time. Each job belongs to a certain family. All jobs of one family have identical processing times. Major setups occur between jobs of different families, and we include sequence dependencies. Batches of jobs belonging to the same family can be formed to avoid these setups. Furthermore, we assume serial batching and batch availability. Therefore, the processing time of a batch is the sum of the processing times of all jobs grouped into the corresponding batch. An iterative method is developed for solving this specific problem. This approach alternates between varying batch sizes using an efficient heuristic and sequencing batches based on variable neighborhood search (VNS). Computational results demonstrate that the iterative heuristic outperforms heuristics based on a fixed batch size and list scheduling.  相似文献   

14.
Consider a scheduling problem (P) which consists of a set of jobs to be performed within a limited number of time periods. For each job, we know its duration as an integer number of time periods, and preemptions are allowed. The goal is to assign the required number of time periods to each job while minimizing the assignment and incompatibility costs. When a job is performed within a time period, an assignment cost is encountered, which depends on the involved job and on the considered time period. In addition, for some pairs of jobs, incompatibility costs are encountered if they are performed within common time periods. (P) can be seen as an extension of the multi-coloring problem. We propose various solution methods for (P) (namely a greedy algorithm, a descent method, a tabu search and a genetic local search), as well as an exact approach. All these methods are compared on different types of instances.  相似文献   

15.
The response time variability problem (RTVP) is a scheduling problem with a wide range of real-world applications: mixed-model assembly lines, multi-threaded computer systems, network environments, broadcast of commercial videotapes and machine maintenance, among others. The RTVP arises whenever products, clients or jobs need to be sequenced in such a way that the variability in the time between the points at which they receive the necessary resources is minimised. Since the RTVP is NP-hard, several heuristic and metaheuristic techniques are needed to solve non-small instances. The published metaheuristic procedure that obtained the best solutions, on average, for non-small RTVP instances is an algorithm based on a variant of the variable neighbourhood search (VNS), called Reduced VNS (RVNS). We propose hybridising RVNS with three existing algorithms based on tabu search, multi-start and particle swarm optimisation. The aim is to combine the strengths of the metaheuristics. A computational experiment is carried out and it is shown that, on average, all proposed hybrid methods are able to improve the best published solutions.  相似文献   

16.
We consider the problem of minimizing the sum of completion times in a two-machine permutation flowshop subject to setup times. We propose a new priority rule, several constructive heuristics, local search procedures, as well as an effective multiple crossover genetic algorithm. Computational experiments carried out on a large set of randomly generated instances provide evidence that a constructive heuristic based on newly derived priority rule dominates all the proposed constructive heuristics. More specifically, we show that one of our proposed constructive heuristics outperforms the best constructive heuristic in the literature in terms of both error and computational time. Furthermore, we show that one of our proposed local search-based heuristics outperforms the best local search heuristic in the literature in terms of again both error and computational time. We also show that, in terms of quality-to-CPU time ratio, the multiple crossover genetic algorithm performs consistently well.  相似文献   

17.
This paper presents some new heuristics based on variable neighborhood search to solve the vertex weighted k-cardinality tree problem. An efficient local search procedure is also developed for use within these heuristics. Our computational results demonstrate that the new heuristics substantially outperform the state-of-the-art methodologies, including a tabu search and genetic algorithm recently proposed in the literature. We also show that a decomposition approach is best for larger problem sizes than previously investigated. Thus, our findings advance in a significant way the capacity to solve this important class of problems.  相似文献   

18.
When solving a product/process design problem, we must exploit the available degrees of freedom to cope with a variety of issues. Alternative process plans can be generated for a given product, and choosing one of them has implications on manufacturing functions downstream, including planning/scheduling. Flexible process plans can be exploited in real time to react to machine failures, but they are also relevant for off-line scheduling. On the one hand, we should select a process plan in order to avoid creating bottleneck machines, which would deteriorate the schedule quality; on the other one we should aim at minimizing costs. Assessing the tradeoff between these possibly conflicting objectives is difficult; actually, it is a multi-objective problem, for which available scheduling packages offer little support. Since coping with a multi-objective scheduling problem with flexible process plans by an exact optimization algorithm is out of the question, we propose a hierarchical approach, based on a decomposition into a machine loading and a scheduling sub-problem. The aim of machine loading is to generate a set of efficient (non-dominated) solutions with respect to the load balancing and cost objectives, leaving to the user the task of selecting a compromise solution. Solving the machine loading sub-problem essentially amounts to selecting a process plan for each job and to routing jobs to the machines; then a schedule must be determined. In this paper we deal only with the machine loading sub-problem, as many scheduling methods are already available for the problem with fixed process plans. The machine loading problem is formulated as a bicriterion integer programming model, and two different heuristics are proposed, one based on surrogate duality theory and one based on a genetic descent algorithm. The heuristics are tested on a set of benchmark problems.  相似文献   

19.
Consider a project which consists of a set of jobs to be performed, assuming each job has a duration of at most one time period. We assume that the project manager provides a set of possible durations (in time periods) for the whole project. When a job is assigned to a specific time period, an assignment cost is encountered. In addition, for some pairs of jobs, an incompatibility cost is encountered if they are performed at the same time period. Both types of cost depend on the duration of the whole project, which also has to be determined. The goal is to assign a time period to each job while minimizing the costs. We propose a tabu search heuristic, as well as an adaptive memory algorithm, and compare them with other heuristics on large instances, and with an exact method on small instances. Variations of the problems are also discussed  相似文献   

20.
We present a new dominance rule by considering the time-dependent orderings between each pair of jobs for the single machine total weighted tardiness problem with release dates. The proposed dominance rule provides a sufficient condition for local optimality. Therefore, if any sequence violates the dominance rule then switching the violating jobs either lowers the total weighted tardiness or leaves it unchanged. We introduce an algorithm based on the dominance rule, which is compared to a number of competing heuristics for a set of randomly generated problems. Our computational results indicate that the proposed algorithm dominates the competing algorithms in all runs, therefore it can improve the upper bounding scheme in any enumerative algorithm. The proposed time-dependent local dominance rule is also implemented in two local search algorithms to guide these algorithms to the areas that will most likely contain the good solutions.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号