The problem of scheduling in permutation flowshops is considered in this paper with the objectives of minimizing the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of jobs, with each objective considered separately. Lower bounds on the given objective (corresponding to a node generated in the scheduling tree) are developed by solving an assignment problem. Branch-and-bound algorithms are developed to obtain the best permutation sequence in each case. Our algorithm incorporates a job-based lower bound (integrated with machine-based bounds) with respect to the weighted flowtime/weighted tardiness/weighted flowtime and weighted tardiness, and a machine-based lower bound with respect to the weighted earliness of jobs. The proposed algorithms are evaluated by solving many randomly generated problems of different problem sizes. The results of an extensive computational investigation for various problem sizes are presented. In addition, one of the proposed branch-and-bound algorithms is compared with a related existing branch-and-bound algorithm.  相似文献   

2.
This study proposes an efficient exact algorithm for the precedence-constrained single-machine scheduling problem to minimize total job completion cost where machine idle time is forbidden. The proposed algorithm is based on the SSDP (Successive Sublimation Dynamic Programming) method and is an extension of the authors’ previous algorithms for the problem without precedence constraints. In this method, a lower bound is computed by solving a Lagrangian relaxation of the original problem via dynamic programming and then it is improved successively by adding constraints to the relaxation until the gap between the lower and upper bounds vanishes. Numerical experiments will show that the algorithm can solve all instances with up to 50 jobs of the precedence-constrained total weighted tardiness and total weighted earliness–tardiness problems, and most instances with 100 jobs of the former problem.  相似文献   

3.
The problem of scheduling on a single machine is considered in this paper with the objective of minimizing the sum of weighted tardiness of jobs. A new ant-colony optimization (ACO) algorithm, called fast ACO (FACO), is proposed and analysed for solving the single-machine scheduling problem. By considering the benchmark problems available in the literature for analysing the performance of algorithms for scheduling on a single machine with the consideration of weighted tardiness of jobs, we validate the appropriateness of the proposed local-search schemes and parameter settings used in the FACO. We also present a comparison of the requirements of CPU time for solving the single-machine total-weighted tardiness problem by the FACO and the existing algorithms.  相似文献   

4.
In this paper, we consider a permutation flowshop scheduling problem with deteriorating jobs. The objective is to minimize the total tardiness of all jobs. A branch-and-bound algorithm incorporating with a dominance property and a lower bound is developed. Furthermore, two metaheuristic algorithms, the simulated annealing algorithm, and the particle swarm optimization method, are proposed. Finally, computational studies are given.  相似文献   

5.
In this paper we consider the single machine scheduling problem with exponential learning functions. By the exponential learning functions, we mean that the actual job processing time is a function of the total normal processing times of the jobs already processed. We prove that the shortest processing time (SPT) rule is optimal for the total lateness minimization problem. For the following three objective functions, the total weighted completion time, the discounted total weighted completion time, the maximum lateness, we present heuristic algorithms according to the corresponding problems without exponential learning functions. We also analyse the worst-case bound of our heuristic algorithms. It also shows that the problems of minimizing the total tardiness and discounted total weighted completion time are polynomially solvable under some agreeable conditions on the problem parameters.  相似文献   

6.
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize total earliness and tardiness when family setup times exist. The paper proposes optimal branch-and-bound algorithms for both the group technology assumption and if the group technology assumption is removed. A heuristic algorithm is proposed to solve larger problems with the group technology assumption removed. The proposed algorithms were empirically evaluated on problems of various sizes and parameters. The paper also explores how the choice of procedure affects total earliness and tardiness if an implementation of lean production methods has resulted in a reduction in setup times. An important finding of these empirical investigations is that scheduling jobs by removing the group technology assumption can significantly reduce total earliness and tardiness.  相似文献   

7.
In this paper, we consider the single-machine scheduling problems with a time-dependent deterioration. By the time-dependent deterioration, we mean that the processing time of a job is defined by an increasing function of total normal processing time of jobs in front of it in the sequence. The objective is to minimize the total completion time. We develop a mixed integer programming formulation for the problem. The complexity status of this problem remains open. Hence, we use the smallest normal processing time (SPT) first rule as a heuristic algorithm for the general cases and analyze its worst-case error bound. Two heuristic algorithms utilize the V-shaped property are also proposed to solve the problem. Computational results are presented to evaluate the performance of the proposed algorithms.  相似文献   

8.
Even though a very large number of solution methods has been developed for the job-shop scheduling problem, a majority has been designed for the makespan criterion. In this paper, we propose a general approach for optimizing any regular criterion in the job-shop scheduling problem. The approach is a local search method that uses a disjunctive graph model and neighborhoods generated by swapping critical arcs. The connectivity property of the neighborhood structure is proved and a novel efficient method for evaluating moves is presented. Besides its generality, another prominent advantage of the proposed approach is its simple implementation that only requires to tune the range of one parameter. Extensive computational experiments carried out on various criteria (makespan, total weighted flow time, total weighted tardiness, weighted sum of tardy jobs, maximum tardiness) show the efficiency of the proposed approach. Best results were obtained for some problem instances taken from the literature.  相似文献   

9.
This paper addresses a bi-criteria two-machine flowshop scheduling problem when the learning effect is present. The objective is to find a sequence that minimizes a weighted sum of the total completion time and the maximum tardiness. In this article, a branch-and-bound method, incorporating several dominance properties and a lower bound, is presented to search for the exact solution for small job-size problems. In addition, two heuristic algorithms are proposed to overcome the inefficiency of the branch-and-bound algorithm for large job-size problems. Finally, computational results for this problem are provided to evaluate the performance of the proposed algorithms.  相似文献   

10.
在某些生产制造场景中,工件在不同机器间的传输时间对车间调度的总拖期具有重要影响,本文基于此扩展了总拖期最小的柔性作业车间调度模型。针对问题模型的复杂性,采用粒子群优化算法和遗传算法的混合算法进行求解。在初始化过程以一定概率优选加工时间和传输时间短的机器并排除调度频繁的机器,使种群在保持多样性的前提下尽量选择优化结果好的个体;采用线性调整的方式动态改变交叉概率和变异概率的值,使种群在遗传算法的不同阶段具有不同的搜索强度;采用粒子群优化算法进行局部搜索,弥补了遗传算法局部搜索能力的不足。最后采用本文方法和其他方法求解柔性作业车间调度问题实例,并对比不同水平层次传输时间下的总拖期,验证了本文方法的有效性。  相似文献   

11.
We extend the dynasearch technique, recently proposed by Congram et al., in the context of time-dependent combinatorial optimization problems. As an application we consider a general time-dependent (idleness) version of the well known single-machine total weighted tardiness scheduling problem, in which the processing time of a job depends on its starting time of execution. We develop a multi-start local search algorithm and present experimental results on several types of instances showing the superiority of the dynasearch neighborhood over the traditional one.  相似文献   

12.
In this paper we consider the single machine past-sequence-dependent (p-s-d) setup times scheduling problems with general position-dependent and time-dependent learning effects. By the general position-dependent and time-dependent learning effects, we mean that the actual processing time of a job is not only a function of the total normal processing times of the jobs already processed, but also a function of the job’s scheduled position. The setup times are proportional to the length of the already processed jobs. We consider the following objective functions: the makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times, the total lateness, the total weighted completion time, the maximum lateness, the maximum tardiness and the number of tardy jobs. We show that the problems of makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times and the total lateness can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem, the maximum lateness minimization problem, maximum tardiness minimization problem and the number of tardy jobs minimization problem can be solved in polynomial time under certain conditions.  相似文献   

13.
In this paper, we consider the single machine scheduling problems with an actual time-dependent deterioration effect. By the actual time-dependent deterioration effect, we mean that the processing time of a job is defined by increasing function of total actual processing time of jobs in front of it in the sequence. We show that even with the introduction of an actual time-dependent deterioration to job processing times, makespan minimization problem, total completion time minimization problem, the total lateness, and the sum of the quadratic job completion times minimization problem remain polynomially solvable, respectively. We also show that the total weighted completion time minimization problem, the discounted total weighted completion time minimization problem, the maximum lateness minimization problem, and the total tardiness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

14.
With the prevalence of on-time scheduling, timely product submission has become a crucial contributor to customer satisfaction. Studies examining on-time scheduling primarily seek to determine the minimum weighted sum of earliness and tardiness penalties. This study assumes that all machines are identical. Furthermore, this study assumes that jobs are independent and share a common due date window when investigating scheduling problems involving parallel machines with a minimum total number of early and tardy jobs (or maximum number of on-time jobs). This study presents related theorems and a novel simplified algorithm based on the problem. Additionally, rule characteristics are examined, and simulated data are used to verify the effectiveness and timeliness of the proposed algorithm. The theoretical proof and data test results all indicate that the proposed approach obtains the best solution within the shortest time.  相似文献   

15.
We consider several single machine scheduling problems in which the processing time of a job is a linear function of its starting time and jobs can be rejected by paying penalties. The objectives are to minimize the makespan, the total weighted completion time and the maximum lateness/tardiness plus the total penalty of the rejected jobs. We show that these problems are NP-hard, and design algorithms based on dynamic programming (including pseudo-polynomial time optimal algorithms and fully polynomial time approximation schemes) to solve them.  相似文献   

16.
In this paper, a hybrid genetic algorithm is developed to solve the single machine scheduling problem with the objective to minimize the weighted sum of earliness and tardiness costs. First, dominance properties of (the conditions on) the optimal schedule are developed based on the switching of two adjacent jobs i and j. These dominance properties are only necessary conditions and not sufficient conditions for any given schedule to be optimal. Therefore, these dominance properties are further embedded in the genetic algorithm and we call it genetic algorithm with dominance properties (GADP). This GADP is a hybrid genetic algorithm. The initial populations of schedules in the genetic algorithm are generated using these dominance properties. GA can further improve the performance of these initial solutions after the evolving procedures. The performances of hybrid genetic algorithm (GADP) have been compared with simple genetic algorithm (SGA) using benchmark instances. It is shown that this hybrid genetic algorithm (GADP) performs very well when compared with DP or SGA alone.  相似文献   

17.
The problem of minimizing total tardiness assumes that the N jobs to be processed on a single machine are simultaneously available at time zero. Since due dates and sequence-independent processing times are known, the problem is to determine a processing sequence, from the N! possible sequences, which minimizes the sum of tardiness for all the jobs in the set. The powerful dominance theorems of Emmons are exploited with a new heuristic procedure, avoiding enumeration of all possible sequences. For large problems, often any one of many jobs can be processed first with no change in total tardiness; however, the set of jobs which can occupy the last position in an optimal sequence is much more limited, and easily identified by application of special dominance properties. The heuristic uses Net Benefit of Relocation (NBR) analysis to determine which job should come last to reduce total tardiness. The simplicity of the algorithm enables manual solutions to small problems. Experimentation indicates that the NBR heuristic offers vast improvement over the adjacent pairwise interchange (API) heuristic of Fry et al., both in solution quality and computational effort. The NBR heuristic also performs well compared with the optimizing routine of Potts and Van Wassenhove, especially in the case of large problems where a modest growth in total tardiness is accompanied by drastically reduced computer requirements.  相似文献   

18.
This paper deals with a bi-criteria single machine scheduling problem with a time-dependent learning effect and release times. The objective is to minimize the weighted sum of the makespan and the total completion time. The problem is NP-hard, thus a mixed integer non-linear programming formulation is presented, and a set of dominance properties are developed. To solve the problem efficiently, a procedure is then proposed by incorporating the dominance properties with an ant colony optimization algorithm. In the proposed algorithm, artificial ants construct solutions as orders of jobs based on the heuristic information as well as pheromone trails. Then, the dominance properties are added to obtain better solutions. To evaluate the algorithm performance, computational experiments are conducted.  相似文献   

19.
We study the one-machine scheduling problem with release dates and we look at several objective functions including total (weighted) tardiness and total (weighted) completion time. We describe dominance rules for these criteria, as well as techniques for using these dominance rules to build heuristic solutions. We use them to improve certain well-known greedy heuristic algorithms from the literature. Finally, we introduce a Tabu Search method with a neighborhood based on our dominance rules. Experiments show the effectiveness of our techniques in obtaining very good solutions for all studied criteria.  相似文献   

20.
In this study, a tabu search (TS) approach to the single machine total weighted tardiness problem (SMTWT) is presented. The problem consists of a set of independent jobs with distinct processing times, weights and due dates to be scheduled on a single machine to minimize total weighted tardiness. The theoretical foundation of single machine scheduling with due date related objectives reveal that the problem is NP-hard, rendering it a challenging area for meta-heuristic approaches. This paper presents a totally deterministic TS algorithm with a hybrid neighborhood and dynamic tenure structure, and investigates the strength of several candidate list strategies based on problem specific characteristics in increasing the efficiency of the search. The proposed TS approach yields very high quality results for a set of benchmark problems obtained from the literature.  相似文献   