首页 | 本学科首页   官方微博 | 高级检索  
     检索      

半刚接钢框架内填暗竖缝混凝土剪力墙结构的简化滞回分析模型
Composite inclined strut hysteretic model for partially-restrained steel frame with concealed vertical slit reinforced concrete infill walls
引用本文:孙国华,顾强,方有珍,杨文侠.半刚接钢框架内填暗竖缝混凝土剪力墙结构的简化滞回分析模型
Composite inclined strut hysteretic model for partially-restrained steel frame with concealed vertical slit reinforced concrete infill walls[J].计算力学学报,2016,33(2):223-230.
作者姓名:孙国华  顾强  方有珍  杨文侠
作者单位:1. 苏州科技大学江苏省结构工程重点实验室,苏州215011; 河海大学土木与交通学院,南京210098;2. 苏州科技大学江苏省结构工程重点实验室,苏州,215011;3. 河海大学土木与交通学院,南京210098; 江苏沪宁钢机股份有限公司,宜兴214231
基金项目:国家自然科学基金(51108292);中国博士后科学基金(2013M531267);江苏省结构工程重点实验室基金(ZD1003);江苏省青蓝工程优秀青年骨干教师资助项目.
摘    要:为解决半刚接钢框架内填暗竖缝混凝土剪力墙结构(简称PSRCW )在工程应用中的数值分析问题,根据PSRCW结构试验所获得的破坏模式、钢筋混凝土(RC )墙的裂缝分布规律和结构传力机理,提出了可用于分析PSRCW结构抗震性能的组合斜压带滞回模型。暗竖缝RC墙组合斜压带滞回模型主要由两部分构成。(1)主对角斜压带部分,用于模拟暗竖缝对PSRCW结构水平承载力的贡献。(2)壁柱部分,用于模拟缝间墙的力学行为。基于暗竖缝RC墙的受力机理推导了主对角斜压带的有效宽度计算方法,并结合混凝土的应力‐应变关系给出了主对角斜压带的滞回恢复力模型。采用组合斜压带模型模拟了已有的典型试验,并与试验结果进行了比较,两者吻合较好,进一步证实了本文所提出的组合斜压带滞回模型的合理性。

关 键 词:半刚接钢框架  内填墙  暗竖缝  滞回性能  斜压带
收稿时间:2014/10/13 0:00:00
修稿时间:2015/5/12 0:00:00

Composite inclined strut hysteretic model for partially-restrained steel frame with concealed vertical slit reinforced concrete infill walls
SUN Guo-hu,GU Qiang,FANG You-zhen and YANG Wen-xia.Composite inclined strut hysteretic model for partially-restrained steel frame with concealed vertical slit reinforced concrete infill walls[J].Chinese Journal of Computational Mechanics,2016,33(2):223-230.
Authors:SUN Guo-hu  GU Qiang  FANG You-zhen and YANG Wen-xia
Institution:Jiangsu Key Laboratory of Structure Engineering, Suzhou University of Science and Technology, Suzhou 215011, China;School of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China;Jiangsu Key Laboratory of Structure Engineering, Suzhou University of Science and Technology, Suzhou 215011, China;School of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China;Jiangsu Key Laboratory of Structure Engineering, Suzhou University of Science and Technology, Suzhou 215011, China;School of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China;Jiangsu Huning Steel Mechanism Co., Ltd, Yixing 214231, China
Abstract:To solve numerical simulation of partially-restrained (PR) steel frame with concealed vertical slit reinforced concrete (RC) infill walls (PSRCW) in the engineering design stage,a simplified compo-site inclined strut hysteretic model was proposed based on the experimental phenomena,the cracks distribution of RC infill wall,and the transferring mechanism of PSRCW.The simplified composite inclined strut hysteretic model of concealed vertical slit RC infill wall was simulated via two parts.The main diagonal inclined strut was used to reflect the transferring lateral force by the contribution of the thickness of concealed vertical slits.The wall-column part was to simulate the mechanical behavior of slit walls.The effective width of the main diagonal inclined strut was deduced through the internal mechanism of the concealed vertical slit RC infill walls,and the cyclic restored force model of the main diagonal inclined strut was deduced based on the stress vs.strain relationship curves of concrete.In addition,the comparison between the results of calculation using the composite inclined strut hysteretic model and those of corresponding tests showed good agreement.
Keywords:PR steel frame  infill walls  concealed vertical slit  hysteretic behavior  inclined strut
本文献已被 万方数据 等数据库收录!
点击此处可从《计算力学学报》浏览原始摘要信息
点击此处可从《计算力学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号