首页 | 本学科首页   官方微博 | 高级检索  
     


Estimating Job Flow-Times in a Job Shop for Contractually Negotiated Due-Dates
Authors:Bernard W. Taylor  Suffix"  >III,Laurence J. Moore
Affiliation:1.Virginia Polytechnic Institute and State University,
Abstract:One of the most important aspects of job shop planning is the contract negotiation process. In this process the job shop vendor must negotiate a job due-date acceptable to both job shop and the customer. Failure to obtain reasonably accurate predictions of the job completion time can result in penalties and/or lost future sales for the job shop. As such, estimation of job flow-times is critical to successful job shop operation. This paper presents a network modelling approach to the difficult and complex task of estimating job flow-times not previously presented in the literature. The approach is demonstrated via a case example where the system model is developed as a Q-GERT network and simulation results are obtained.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号