Estimating Job Flow-Times in a Job Shop for Contractually Negotiated Due-Dates |
| |
Authors: | Bernard W. Taylor Suffix" >III,Laurence J. Moore |
| |
Affiliation: | 1.Virginia Polytechnic Institute and State University, |
| |
Abstract: | One of the most important aspects of job shop planning is the contract negotiation process. In this process the job shop vendor must negotiate a job due-date acceptable to both job shop and the customer. Failure to obtain reasonably accurate predictions of the job completion time can result in penalties and/or lost future sales for the job shop. As such, estimation of job flow-times is critical to successful job shop operation. This paper presents a network modelling approach to the difficult and complex task of estimating job flow-times not previously presented in the literature. The approach is demonstrated via a case example where the system model is developed as a Q-GERT network and simulation results are obtained. |
| |