首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Planning and scheduling of multistage multiproduct batch plants operating under production campaigns
Authors:Yanina Fumero  Gabriela Corsano  Jorge M Montagna
Institution:1. INGAR, Instituto de Desarrollo y Dise?o (CONICET-UTN), Avellaneda 3657, S3002GJC, Santa Fe, Argentina
2. CIDISI, Centro de Investigaci??n y Desarrollo en Ingenier??a en Sistemas de Informaci??n, Facultad Regional Santa Fe, Universidad Tecnol??gica Nacional, Santa Fe, Argentina
Abstract:When plants are operated under stable conditions during reasonable time periods, operation with campaigns is particularly appropriate. The regular operation of the facilities simplifies the production control, the inventory management, the plant operability, etc. A?campaign includes several batches of different products that are going to be manufactured and the same one is cyclically repeated over the time horizon. In this work, a mixed integer linear programming formulation is proposed for the planning and scheduling of given multiproduct batch plants operating with campaigns. The number and size of batches for each product, the campaign composition, the assignment of batches to units and their sequencing, and the number of times that the campaign is repeated over the time horizon must be determined. Taking into account this scenario, an appropriate performance measure is the minimization of the cycle time. An asynchronous slot-based continuous-time representation for modeling the assignment of batches to units and their sequencing is employed, and a novel rule for determining the maximum number of slots postulated for each unit is proposed.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号