Risk assesment of a new high-speed railway
Authors:LEIHTON  CL; DENIS  CR
Institution: Network Technical Centre, Union Railways Limited Wellesley Grove, Croydon CR9 1DY
W.S.Atkins Consultants Limited Woodcote Grove, Ashley Road, Epsom, Surrey KT18 5BW
Abstract:A quantitative risk assessment has been carried out for theconceptual stage of the proposed Channel Tunnel Rail Link (CTRL).The assessment is one of the first for a railway system. Itincludes an integrated computer model. The whole risk modelfor the CTRL from base event data, through fault and event trees,to individual, collective, and societal risks is processed usingLotus 1-2-3 spreadsheets. Variations to the design and operationalassumptions and to the input data can be introduced into themodel, and the effect on risk calculated rapidly. This versatilityis particularly useful because of the early stage of the project.It can be used to assist designers in consideration of possibledesign changes.
Keywords:
本文献已被 Oxford 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号