Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm
Authors:Lucio Bianco  Massimiliano Caramia
Affiliation:1. Dipartimento di Ingegneria dell’Impresa, Università di Roma “Tor Vergata”, Via del Politecnico, 1, 00133, Roma, Italy
Abstract:In this paper we study an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) with minimum makespan objective by introducing a special type of precedence constraints called “Feeding Precedences” (FP). To the best of our knowledge no exact algorithm exists for this problem. Exploiting the lower bound and the mathematical formulation proposed in Bianco and Caramia (4OR 9(4):371–389 2011) for the RCPSP with FP, in this paper we propose an exact algorithm based on branch and bound rules. A computational experimentation on randomly generated instances and a comparison with the results achieved by a commercial solver, show that the proposed approach is able to behave satisfactorily.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号