Scheduling crossover cranes at container terminals during seaside peak times |
| |
Authors: | Anne Ehleiter Florian Jaehn |
| |
Affiliation: | 1.Sustainable Operations and Logistics,University of Augsburg,Augsburg,Germany;2.Management Science and Operations Research,Helmut-Schmidt-University - University of the Federal Armed Forces Hamburg,Hamburg,Germany |
| |
Abstract: | This paper deals with crane scheduling in a block of a container terminal equipped with two crossover cranes. We concentrate on the situation when all requests in this block refer to the seaside. This seaside peak time occurs when a container ship is berthed and has to be served as quickly as possible because berthing time is a major cost driver for both, the shipping company and the port operator. In this case, the two cranes highly interfere. We formulate this problem as a MIP, prove its (mathcal {NP})-hardness and introduce a lower bound. Further, we provide several heuristic solution procedures based on priority rules. A comparison of all procedures concludes this paper and gives insights on how to solve this problem in practice. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|