首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Controlling a Production Scheduling System
Authors:C E Montagnon
Institution:1.Dunlop Company Ltd., Coventry and University of Warwick,
Abstract:When using an automatic production scheduling system management require the system to respond to different overall policies, such as clear all arrears or minimize average lateness weighted by job importance. In many commercial scheduling packages there is no quantitative explanation of how to achieve this response. A successfully implemented scheduling system is introduced here where each policy or objective is obtained by selecting the appropriate criterion on which to sort the jobs. An analytical relationship between the policy and the sorting criterion is established. A new type of lateness penalty is developed heuristically, which is basically an exponential function. The sorting criterion to minimise this lateness penalty turns out to be simply sorting by least slack.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号