首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Scheduling Production in a Heavily Constrained Plant – Anode Manufacture in an Aluminium Smelter
Authors:Miles G Nicholls
Institution:1.Swinburne University of Technology,Australia
Abstract:In this paper a mathematical model of an anode manufacturing plant is developed with the objective of assisting in the planning and scheduling of production for up to a month ahead. A model of the overall smelter already exists and is based on a monthly time frame. The anode plant is a part of this model but is a very heavily constrained area and it is necessary to have a daily planning model that will help to achieve the optimal level of operations as dictated by the overall model of the smelter. The anode area is responsible for the production of carbon blocks (called anodes) which are an integral part of the aluminium smelting process. The plant is also responsible for the delivery of all raw materials within the smelter. The model developed is a daily one replicated for up to a month ahead, interconnected by opening and closing stocks.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号