首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Inventory control of service parts in the final phase
Institution:1. Mathematics Research Unit, University of Luxembourg, Maison du Nombre, 6, avenue de la Fonte, Esch-sur-Alzette L-4364, Luxembourg;2. Department of Mathematics, University of Liège, Allée de la Découverte, 12 - B37, Liège B-4000, Belgium;3. Facultad de Matemáticas, Universidad de Murcia, Murcia 30100, Spain;4. Laboratoire de Mathématiques et de leurs Applications de Pau – Fédération IPRA, CNRS / Univ Pau & Pays Adour, UMR 5142, Pau 64000, France
Abstract:We consider an appliance manufacturer's problem of controlling the inventory of a service part in its final phase. That phase begins when the production of the appliance containing that part is discontinued (time 0), and ends when the last service contract on that appliance expires. Thus, the planning horizon is deterministic and known. There is no setup cost for ordering. However, if a part is not ordered at time 0, its price will be higher. The objective is to minimize the total expected undiscounted costs of replenishment, inventory holding, backorder, and disposal (of unused parts at the end of the planning horizon). We propose an ordering policy consisting of an initial order-up-to level at time 0, and a subsequent series of decreasing order-up-to levels for various intervals of the planning horizon. We present a method of calculating the optimal policy, along with a numerical example and sensitivity analysis.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号