首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Status of the IHEP 1.3 GHz superconducting RF program
Authors:Gao  Jie  Zhai  JiYuan  Pan  WeiMin  Li  ShaoPeng  Sun  Yi  Dai  JianPing  Chi  YunLong  Li  ZhongQuan  Zhao  TongXian  Huang  TongMing  Ma  Qiang  Ge  Rui  Li  ChunHua  Guo  HaiSheng  Wang  GuangWei  Qiu  Feng  Lin  HaiYing  Hou  Mi  Wang  QunYao
Institution:1.Institute of High Energy Physics,Chinese Academy of Sciences,Beijing,China
Abstract:The 1.3 GHz superconducting radio-frequency (SRF) technology is one of the key technologies for the ILC and future XFEL and ERL projects in China. With the aim to develop 1.3 GHz SRF technology, IHEP has started a program to build an SRF Accelerating Unit. This unit contains a 9-cell 1.3 GHz superconducting cavity, a short cryomodule, a high power input coupler, a tuner and a low level RF system. This program also includes the SRF laboratory upgrade, which will permit the unit to be built and tested at IHEP. The unit will be used for the 1.3 GHz SRF system integration study, high power horizontal test and possible beam test in the future. In this paper, we report the recent R&D status of this program. The first large grain low-loss shape 9-cell superconducting RF cavity made by IHEP reached 20 MV/m in the first vertical test in July, 2010. The prototype tuner and low level RF (LLRF) system are under test. The high power input coupler and cryomodule are under fabrication. Several key SRF facilities for 9-cell cavity surface treatment and pre-tuning were successfully commissioned and are in operation.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号