首页 | 本学科首页   官方微博 | 高级检索  
     


Joint determination of production run length and number of standbys in a deteriorating production process
Affiliation:1. Department of Systems Engineering and Engineering Management, City University of Hong Kong, Hong Kong;2. The Israel Electric Corporation Ltd., Israel;1. Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran;2. School of Engineering and Sciences, Tecnológico de Monterrey, E. Garza Sada 2501 Sur, C.P. 64849 Monterrey, Nuevo León, Mexico
Abstract:Two economic manufacturing quantity models with unrepairable and repairable standby key modules are proposed in this study that determine the economic production run length and the economic number of standbys in a deteriorating production process, where the key module of the production unit deteriorates over time and incurs some portion of defective items. For the model with unrepairable standbys, the active key module, once deteriorating, is replaced by a standby and the module itself is disposed. For the model with repairable standbys, the deteriorating key module is replaced by a standby and the module is then sent to the service center for maintenance. When completing the maintenance, it then joins the standbys for later production use. By minimizing the annual cost, which takes into account setup cost, holding cost, costs due to standbys and defective items, the economic production run length and the economic number of standbys are obtained for each of the proposed models.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号