首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Monitoring of the Alamillo cable-stayed bridge during construction
Authors:J R Casas  A C Aparicio
Institution:(1) School of Civil Engineering, Technical University of Catalunya, 08034 Barcelona, Spain
Abstract:The Alamillo Bridge is one of the long-span bridges crossing the Guadalquivir River. It was built on the occasion of Expo '92 in 1992 in Sevilla, Spain. The bridge is a cable-stayed structure spanning 200 m without any intermediate supports. Its originality is the lack of back stays and the balancing of the front stays through the backward inclination of a massive pylon. This paper shows the importance of experimental in situ techniques when applied to unconventional civil engineering structures and how—with the help of an important amount of accurate instrumentation, monitoring the most important experimental variables—it was possible to build the bridge correctly, safely, and on schedule.
Keywords:Cable-stayed bridge  bridge monitoring  segmental construction  instrumentation  model updating  vibration testing
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号