首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Production,installation and test of Nb-sputtered QWRs for ALPI
Authors:A M Porcellato  V Palmieri  L Bertazzo  A Capuzzo  D Giora  F Stivanello  S Y Stark  S Kar
Institution:(1) INFN, Laboratori Nazionali di Legnaro (Pd), Italy;(2) Strumenti Scientifici Cinel, Vigonza (Pd), Italy;(3) Nuclear Science Centre, Aruna Asaf Ali Marg, New Delhi, India
Abstract:Eight cryostats, each housing 4 sputtered Nb/Cu, 160 MHz, quarter wave resonators (QWR), are now in operation in ALPI1]. Two of them house high β cavities; the others are equipped with medium β resonators. Another medium β cryostat is ready and will be installed in the early 2002. Pb/Cu medium β accelerating cavities are now present only in four cryostats and they will have their Pb superconducting (SC) layer replaced by sputtered Nb soon. The substitution of the Pb SC layer in ALPI medium β resonators did not interfere with ALPI operation; the upgrading of resonators went on parallel to the cryostat maintenance programme. The average accelerating field of these resonators, at the design power of 7 W, overcomes 4 MV/m, whereas, when Pb electroplated, their average value was 2.7 MV/m. The sputtered resonator combines the good SC characteristics of Nb with the higher thermal conductivity and better stability to change of He bath pressure, which is typical of copper resonators. This leads to a very high reliability, as routinely experienced during beam acceleration.
Keywords:Niobium superconducting cavities  heavy ion LINAC  Nb sputtering
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号