Using hydropower to smooth intermittent and unreliable sources of generation |
| |
Authors: | CB Millham |
| |
Institution: | Washington State University, Pullman, WA 99164-1210, USA |
| |
Abstract: | This work describes, in part, the extent to which the large hydropower system on the Snake and Columbia rivers, and tributaries, could be used to ‘smooth’ or level the intermittent contributions of large numbers of wind generators, so that the sum of these contributions becomes reliable. Data for wind generators on site is given, the methods by which the ‘smoothing’ would occur is described, and a computer simulation model of the Pacific Northwest hydropower system is used to develop several case studies. The several constraints imposed on the flexibility of the hydropower system are defined by streamflow restrictions at the hydropower projects. |
| |
Keywords: | electric power generation hydropower wind generators smoothing |
本文献已被 ScienceDirect 等数据库收录! |
|