近距离斜穿车站富水圆砾地层盾构换刀技术及刀具磨损分析
引用本文:孟庆军,陆云贤,周洋,何玉华,肖鹏飞,王树英.近距离斜穿车站富水圆砾地层盾构换刀技术及刀具磨损分析[J].科学技术与工程,2022,22(31):13965-13972.
作者姓名:孟庆军  陆云贤  周洋  何玉华  肖鹏飞  王树英
作者单位:南宁轨道交通集团有限责任公司;中铁广州工程局集团城轨工程有限公司;中南大学土木工程学院
摘    要:开仓换刀作业是盾构隧道施工中不可避免的技术难题之一,现以南宁市轨道交通5号线新—广区间盾构隧道工程为背景,针对盾构机在富水圆砾、泥岩复合地层中长距离掘进后连续穿越3道地连墙的工程特点,总结刀盘优化布局方案,详细介绍适用于该地层条件下的素桩加固辅以降水作业的换刀方案,并对换刀前后盾构掘进过程中产生的刀具磨损进行测量、分析,揭示了盾构在复合地层中掘进以及直接切削地连墙造成的刀具磨损规律,提出了盾构切削桩基时的合理换刀距离,为后续施工及类似工程提供一定的指导和借鉴。

关 键 词:盾构隧道  地连墙切削  开仓换刀  刀具磨损
收稿时间:2021/11/6 0:00:00
修稿时间:2022/7/28 0:00:00

Cutter change technology and cutter wear analysis of shield machine in water-rich pebble stratum at a short distance across the station
Meng Qingjun,Lu Yunxian,Zhou Yang,He Yuhu,Xiao Pengfei,Wang Shuying.Cutter change technology and cutter wear analysis of shield machine in water-rich pebble stratum at a short distance across the station[J].Science Technology and Engineering,2022,22(31):13965-13972.
Authors:Meng Qingjun  Lu Yunxian  Zhou Yang  He Yuhu  Xiao Pengfei  Wang Shuying
Institution:Nanning Rail Transit Co.Ltd.
Abstract:The operation of opening a chamber and changing a cutter is one of the inevitable technical problems in the construction of shield tunnels. With the shield tunnel project of Nanning Rail Transit Line 5 Xin-Guang Section as the background, it is aimed at the engineering characteristics of the continuous crossing of three ground connecting walls after the long-distance tunneling in the water-rich boulders and mudstone composite stratum. The optimized layout plan of the cutter head is summarized, and the cutter change plan suitable for the pile reinforcement supplemented by the dewatering operation under the conditions of the stratum is introduced in detail, and the cutter change was performed. The measurement and analysis of the cutter wear generated during the tunneling process of the front and rear shields revealed the law of cutter wear caused by the shield tunneling in the composite stratum and the direct cutting of the ground wall, and the reasonable tool change distance when the shield was cutting the pile foundation was proposed. Provide certain guidance and reference for subsequent construction and similar projects.
Keywords:Shield tunnel      ground connecting wall cutting      opening chamber and changing of cutter      tool wear