首页 | 本学科首页   官方微博 | 高级检索  
     检索      


An exact algorithm to minimize mean squared deviation of job completion times about a common due date
Authors:B Srirangacharyulu  G Srinivasan
Institution:1. Indian Institute of Management Tiruchirappalli, Tiruchirappalli 620 015, India;2. Department of Management Studies, Indian Institute of Technology Madras, Chennai 600 036, India
Abstract:We consider a deterministic n-job, single machine scheduling problem with the objective of minimizing the Mean Squared Deviation (MSD) of job completion times about a common due date (d). The MSD measure is non-regular and its value can decrease when one or more completion times increases. MSD problem is connected with the Completion Time Variance (CTV) problem and has been proved to be NP-hard. This problem finds application in situations where uniformity of service is important. We present an exact algorithm of pseudo-polynomial complexity, using ideas from branch and bound and dynamic programming. We propose a dominance rule and also develop a lower bound on MSD. The dominance rule and lower bound are effectively combined and used in the development of the proposed algorithm. The search space is explored using the breadth first branching strategy. The asymptotic space complexity of the algorithm is O(nd). Irrespective of the version of the problem – tightly constrained, constrained or unconstrained – the proposed algorithm provides optimal solutions for problem instances up to 1000 jobs size under different due date settings.
Keywords:Scheduling  Mean squared deviation  Branch and bound  Dynamic programming
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号