首页 | 本学科首页   官方微博 | 高级检索  
     


Shortening cycle times in multi-product,capacitated production environments through quality level improvements and setup reduction
Authors:Moustapha Diaby  Jose M. Cruz  Aaron L. Nsakanda
Affiliation:1. Department of Operations and Information Management, School of Business, University of Connecticut, Storrs, CT 06269-2041, USA;2. Sprott School of Business, Carleton University, 1125 Colonel By Drive, Ottawa, Ontario, Canada K1S 5B6
Abstract:This paper addresses the issue of investing in reduced setup times and defect rates for a manufacturer of several products operating in a JIT environment. Production cycle times can be shortened by investing in setup time and defect rate reductions, respectively. The objective is to determine optimal levels of setup time and defect rate reductions along with the corresponding optimal levels of investments respectively, and the optimal production cycle time for each product. The problem is constrained by demand requirements, process improvement budget limitations, and manufacturing and warehousing capacity constraints. We consider the cases of product-specific quality improvements and joint-product quality improvements. A general nonlinear optimization models of these problems are formulated. A convex geometric programming approximation of these models is developed respectively, in order to solve them. The approximation can be made to any desired degree of accuracy. Our empirical findings provide insights into a number of managerial issues surrounding investment decisions in product-specific quality improvements and setup reductions due to a product redesign as well as in joint-product improvements due to a process redesign.
Keywords:Production planning   Lot scheduling   Setup reduction   Quality improvement   Geometric programming
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号