首页 | 本学科首页   官方微博 | 高级检索  
     检索      

新洋港入海港道冲淤保港需水量研究
引用本文:鞠彬,杭庆丰,李琼芳,李迷,李煜.新洋港入海港道冲淤保港需水量研究[J].河海大学学报(自然科学版),2015,43(6):537-541.
作者姓名:鞠彬  杭庆丰  李琼芳  李迷  李煜
作者单位:河海大学水文水资源学院;河海大学国际河流研究所,江苏省水文水资源勘测局盐城分局,河海大学水文水资源学院;河海大学国际河流研究所,上海市浦东新区水文水资源管理署,河海大学力学与材料学院
基金项目:国家自然科学基金面上项目(41171220);“十二五”国家科技支撑计划(2012BAB03B03);水利部公益性行业科研专项(201001069,201101052)
摘    要:为解决入海港道修建挡潮闸后对涵闸排涝效率以及入海港道通航能力产生较大影响的闸下淤积问题,基于MIKE11模型中的CST模块对盐城市入海港道——新洋港冲淤保港需水量进行研究。MIKE11模型中的CST模块由水动力学模型与泥沙输移模型耦合而成,根据闸下60 m、970 m、3 030 m三处断面的实测水位、流量和河床淤积高度资料,进行水动力学模型和泥沙输移模型参数率定,最终在设定闸下淤积高度不超过0.1 m的条件下,由MIKE11 CST模型确定出的新洋港冲淤保港生态流量为80 m~3/s,接近于2006年12月新洋港引江冲淤实验中得出的不冲不淤情况下的保港流量85 m~3/s。

关 键 词:入海港道  闸下淤积  潮汐运动  MIKE11模型  冲淤保港需水量  新洋港  盐城市
收稿时间:2015/1/30 0:00:00

Study of water requirement for silt scouring in seaward channels at Xinyang Port
JU Bin,HANG Qingfeng,LI Qiongfang,LI Mi and LI Yu.Study of water requirement for silt scouring in seaward channels at Xinyang Port[J].Journal of Hohai University (Natural Sciences ),2015,43(6):537-541.
Authors:JU Bin  HANG Qingfeng  LI Qiongfang  LI Mi and LI Yu
Institution:College of Hydrology and Water Resources, Hohai University, Nanjing 210098, China; Center for International River Research, Hohai University, Nanjing 210098, China,Yancheng Branch, Jiangsu Province Hydrology and Water Resources Investigation Bureau, Yancheng 224002, China,College of Hydrology and Water Resources, Hohai University, Nanjing 210098, China; Center for International River Research, Hohai University, Nanjing 210098, China,Hydrology and Water Resources Management Agency of Pudong New Area, Shanghai 200129, China and College of Mechanics and Materials, Hohai University, Nanjing 210098, China
Abstract:In order to reduce the siltation downstream of tide gates constructed in a seaward channel that has a significant impact on the efficiency of the drainage culvert and navigation capability of the seaward channel, the CST module in the MIKE11 model was used to study the water requirement for silt scouring in the seaward channel at the Xinyang Port in Yancheng City. The CST module was developed by coupling a hydrodynamic model and sediment transport model, with the model parameters calibrated using the measured data of water level, flow rate, and siltation height at three sections, located, respectively, 60 m, 970 m and 3 030 m downstream of the gate. The calculated ecological flow rate for silt scouring and port protection with the MIKE11 CST model was 80 m3/s under a siltation height of no more than 0. 1 m. This value was close to the flow rate of 85 m3/s obtained from experiments on silt scouring by water diversion from the Yangtze River at the Xinyang Port in December 2006, under the conditions of no silting and no scouring.
Keywords:seaward channel  siltation downstream of gate  tidal movement  MIKE11 model  water requirement for silt scouring and port protection  Xinyang Port  Yancheng City
本文献已被 CNKI 等数据库收录!
点击此处可从《河海大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《河海大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号