首页 | 本学科首页   官方微博 | 高级检索  
     检索      

建(构)筑物下盾构注浆加固开仓换刀施工技术
引用本文:胡军.建(构)筑物下盾构注浆加固开仓换刀施工技术[J].科技信息,2011(21):313-314.
作者姓名:胡军
作者单位:上海城建〈集团〉公司,中国上海200083
摘    要:结合深圳地铁2号线2204标盾构项目,通过砂浆置换和超前小导管注浆加固地层,建立土仓内正面土压力平衡,并辅以地面沉降监测,利用监测数据指导施工,实现了常压下开仓换刀,对同类工程在常压下检查、更换刀具具有借鉴意义。

关 键 词:砂浆置换  超前小导管注浆  更换刀具  沉降监测

Floor Reinforcement and Replace Technique of Shield Cutter Teeth Under High-rise Building
HU Jun.Floor Reinforcement and Replace Technique of Shield Cutter Teeth Under High-rise Building[J].Science,2011(21):313-314.
Authors:HU Jun
Institution:HU Jun (Shanghai Urban Construction Group,Shanghai ,200083, China)
Abstract:Based on construction of bid 2204 of Shenzhen metro line 2, use integral displaced with mortar and grouting with leading conduit to reinforce soil, this will establish soil pressure balance in front of cutter head, technician through land subsidence monitoring to get the monitoring data and use the data to guide construction, those methods realizes replacing of cutting teeth under atmospheric Pressure, the paper can be served as reference for similar cases in the future.
Keywords:Displace with mortar  Grouting with leading conduit  Replacing of cutting teeth  Subsidence monitoring
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号