首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Production planning with load dependent lead times
Authors:Julia Pahl  Stefan Voß  David L Woodruff
Institution:1. Institut für Wirtschaftsinformatik, Universit?t Hamburg, Von-Melle-Park 5, 20146, Hamburg, Germany
2. University of California, Graduate School of Management, CA 95616, Davis, USA
Abstract:Lead times impact the performance of the supply chain significantly. Although there is a large literature concerning queuing models for the analysis of the relationship between capacity utilization and lead times, and there is a substantial literature concerning control and order release policies that take lead times into consideration, there have been only few papers describing models at the aggregate planning level that recognize the relationship between the planned utilization of capacity and lead times. In this paper we provide an in-depth discussion of the state-of-the art in this literature, with particular attention to those models that are appropriate at the aggregate planning level. Received: September 2005 / Revised version: November 2005 AMS classification: 46N10 All correspondence to: Stefan Vo?
Keywords:Production planning  load dependent lead times  mathematical programming  supply chain management
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号