Abstract: | In a multi-wire proportional chamber detector(MWPC), the anode and signal wires must maintain suitable tension, which is very important for the detector's stable and accurate performance. As a result, wire tension control and measurement is essential in MWPC construction. A high pressure3 He MWPC detector is to be used as the thermal neutron detector of the multi-functional reflectometer at China Spallation Neutron Source, and in the construction of the detector, we have developed a wire tension measurement system. This system is accurate,portable and time-saving. With it, the wire tension on an anode wire plane has been tested. The measurement results show that the wire tension control techniques used in detector manufacture are reliable. |