首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A new heuristic for open shop total completion time problem
Authors:Lixin Tang  Danyu Bai
Institution:Liaoning Key Laboratory of Manufacturing System and Logistics, The Logistics Institute, Northeastern University, Shenyang 110004, PR China
Abstract:The m  -machine open shop problem to minimize the sum of the completion times is investigated in our paper. First, a heuristic algorithm, Shortest Processing Time Block, is presented to deal with problem Om|n=km|∑CjOm|n=km|Cj, where k   is positive integer. And then, the heuristic is extended to solve the general problem Om‖∑CjOmCj. It is proved that the heuristic is asymptotically optimal when the job number goes to infinity. At the end of this paper, numerical experimentation results show the effectiveness of the heuristic algorithm.
Keywords:Open shop problem  Total completion time  Asymptotical analysis
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号