首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Operations planning with VERT
Authors:Moeller G L  Digman L A
Abstract:The Venture Evaluation and Review Technique (VERT) is a computerized, mathematically oriented network-based simulation technique designed to analyze risk existing in three parameters of most concern to managers in new projects or ventures--time, cost, and performance. As such, the VERT technique is more powerful than techniques such as GERT, which are basically time and cost oriented. VERT has been successfully utilized to assess the risks involved in new ventures and projects, in the estimation of future capital requirements, in control monitoring, and in the overall evaluation of ongoing projects, programs, and systems. It has been helpful to management in cases where there is a requirement to make decisions with incomplete or inadequate information about the alternatives. An example describing the application of VERT to an operational planning problem--the evaluation of electric power generating methods--is illustrated.
Keywords:
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号