摘    要:针对神光Ⅲ主机装置真空靶室系统横向刚度较弱、必须进行现场精密加工和安装等研制中的技术难题,对真空靶室组件的结构和整体加工工艺进行了设计。结合靶场总体稳定性设计思路,设计了垂直支撑结构和能提供摩擦阻尼耗能的横向支撑结构,并对壁厚进行了优化设计。通过使用开孔器、六维调节结构和激光跟踪仪,设计修配调整垫等,解决了现场精密加工问题,实现了靶室与靶场基准体系的精密对接。计算结果表明,48束打靶透镜平均平动位移均方根值为2.8 m。建成后,靶室中心高度偏差为0.12 mm,水平偏差达到0.18 mm,各重要联接法兰对心偏差达到0.35~0.40 mm。

关 键 词:神光Ⅲ主机装置    真空靶室    稳定性设计    现场精密加工    支撑系统
收稿时间:2011/11/9

Development of vaccum target chamber component in Shenguang-Ⅲ laser facility
Xu Yuanli , Chen Xueqian , Gao Haiying , Que Xinghua , Wu Wenkai , Liu Huilin , Xiang Yong , Zhu Mingzhi.Development of vaccum target chamber component in Shenguang-Ⅲ laser facility[J].High Power Laser and Particle Beams,2012,24(11):2623-2626.
Authors:Xu Yuanli  Chen Xueqian  Gao Haiying  Que Xinghua  Wu Wenkai  Liu Huilin  Xiang Yong  Zhu Mingzhi
Institution:1.Institute of System Engineering,CAEP,P.O.Box 919-408,Mianyang 621900,China;2.China Erzhong Group Co.Ltd.,Deyang 618000,China;3.Research Center of Laser Fusion,CAEP,P.O.Box 919-988,Mianyang 621900,China
Abstract:In order to solve technical issues in the development of vaccum target chamber in Shenguang-Ⅲ laser facility, such as weak lateral stiffness and field precision fabrication and installation, the structural design and the whole manufacture process have been proposed. Combining the global stability design of the target area, the vertical pedestal, and the lateral support structure that can provide passive damping have been designed. The thickness of the chamber shell has been optimized. The alignment precision of the field fabrication of the target chamber is satisfied by using the special fixtures, i. e. the laser tracker, the six dimensional adjustment mechanism, and the custom-machined spacers, for accurately boring holes. The analysis shows that the mean root-mean-square value of displacement of 48 focusing lenses is 2.8 μm. After construction, the height deviation of the target chamber center is ±0.12 mm, the horizontal deviation is ±0.18 mm. The centering deviations of the important flanges are from 0.35 mm to 0.4 mm.
Keywords:Shenguang-Ⅲ laser facility  vaccum target chamber  stability design  field precision fabrication  support system
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《强激光与粒子束》浏览原始摘要信息
点击此处可从《强激光与粒子束》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号