A branch-and-price approach for harvest scheduling subject to maximum area restrictions |
| |
Authors: | Isabel Martins Filipe Alvelos Miguel Constantino |
| |
Institution: | (1) IBM Global Business Services, 12902 Federal Systems Park Dr., Fairfax, VA 22033, USA;(2) Department of Engineering Management and Systems Engineering, School of Engineering and Applied Science, The George Washington University, Washington, DC 20052, USA |
| |
Abstract: | Recently, research on exact methods has been undertaken to solve forest management problems subject to constraints on the
maximum clearcut area by using the area restriction model approach. Three main basic integer programming models for these
problems have been discussed in the literature: the so-called cluster, path and bucket formulations. Solving these models
via branch-and-bound, where all variables and constraints are used a priori, is adequately suited for real problems of a small
to medium size, but is not appropriate for larger problems. In this paper, we describe a branch-and-price approach for the
cluster model, and we show that this formulation dominates the bucket model, by completing the results of the dominance relationships
between the bounds of the three models. Branch-and-price was tested on real and hypothetical forests ranging from 45 to 2945
stands and temporal horizons ranging from three to twelve periods were employed. Results show that the solutions obtained
by the proposed approach stood within 1% of the optimal solution and were achieved in a short computation time. It was found
that branch-and-bound was unable to produce solutions for most forests from 850 stands with either eleven or an average number
of stands per clearcut greater or equal than eight. |
| |