A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
Authors:M. Rabbani  S.M.T. Fatemi Ghomi  F. Jolai  N.S. Lahiji
Affiliation:1. Department of Industrial Engineering, University of Tehran, Tehran, Iran;2. Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
Abstract:This paper presents a newly developed resource-constrained project scheduling method in stochastic networks by merging the new and traditional resource management methods. In each project, the activities consume various types of resources with fixed capacities. The duration of each activity is a random variable with a given density function. Since the backward pass method is implemented for feeding-in resources. The problem is to determine the finish time of each activity instead of its start time. The objective of the presented model is defined as minimizing the multiplication of expected project duration and its variance. The values of activities finish times are determined at decision points when at least one activity is ready to be operated and there are available resources. If at a certain point of time, more than one activity is ready to be operated but available resources are lacking, a competition among ready activities is carried out in order to select the activities which must be operated first. This paper suggests a competition routine by implementing a policy to maximize the total contribution of selected activities in reducing the expected project duration and its variance. In this respect, a heuristic algorithm is developed and compared with the other existing methods.
Keywords:Project scheduling   Criticality index   Cruciality index   Stochastic networks   Critical chain
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号