首页 | 本学科首页   官方微博 | 高级检索  
     


Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
Authors:Ruud Teunter  Konstantinos Kaparis  Ou Tang
Affiliation:1. Department of Management Science, Lancaster University Management School, Lancaster LA1 4YX, UK;2. Department of Production Economics, Linköping Institute of Technology, SE-581 83 Linköping, Sweden
Abstract:We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.
Keywords:ELSP   Returns   Remanufacturing   Reverse logistics
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号