首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production
Authors:Aiying Rong  Risto Lahdelma
Institution:1. Technical University of Denmark, Department of Manufacturing Engineering and Management, Building 425, 2800 Kgs, Lyngby (Copenhagen), Denmark;2. University of Turku, Department of Information Technology, Joukahaisenkatu 3-5, FIN-20520 Turku, Finland
Abstract:Optimizing the charge in secondary steel production is challenging because the chemical composition of the scrap is highly uncertain. The uncertainty can cause a considerable risk of the scrap mix failing to satisfy the composition requirements for the final product. In this paper, we represent the uncertainty based on fuzzy set theory and constrain the failure risk based on a possibility measure. Consequently, the scrap charge optimization problem is modeled as a fuzzy chance constrained linear programming problem. Since the constraints of the model mainly address the specification of the product, the crisp equivalent of the fuzzy constraints should be less relaxed than that purely based on the concept of soft constraints. Based on the application context we adopt a strengthened version of soft constraints to interpret fuzzy constraints and form a crisp model with consistent and compact constraints for solution. Simulation results based on realistic data show that the failure risk can be managed by proper combination of aspiration levels and confidence factors for defining fuzzy numbers. There is a tradeoff between failure risk and material cost. The presented approach applies also for other scrap-based production processes.
Keywords:Fuzzy sets  Linear programming  Chance constraint  Scrap charge optimization  Steel production
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号