首页 | 本学科首页   官方微博 | 高级检索  
     


Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
Authors:Taha Keshavarz  Nasser Salmasi  Mohsen Varmazyar
Affiliation:1. Department of Industrial Engineering, Yazd University, P.O. Box 89195-741, Yazd, Iran
2. Department of Industrial Engineering, Sharif University of Technology, P.O. Box 11365-8639, Tehran, Iran
Abstract:
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号