首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Bi-criteria group scheduling with sequence-dependent setup time in a flow shop
Authors:D Lu  R Logendran
Institution:1.Oregon State University,Corvallis,USA
Abstract:A bi-criteria group scheduling problem in a flow shop with sequence-dependent setup time is investigated in this paper. Manufacturing cell and flow shop are two popular scenarios in industry. Dynamic job releases and machine availabilities are assumed. The goal is to minimize the weighted sum of total weighted completion time and total weighted tardiness, which are aimed at satisfying the producer and customer goals separately. Normalized weights are assigned to both criteria to describe the trade-off between the two objectives. Two different initial solution finding mechanisms are proposed, and a tabu-search-based two-level search algorithm is deve1loped to find optimal/near-optimal solutions for the problem. A mathematical model is also developed and implemented to evaluate the optimality of the results from search algorithms for small problem instances. To further uncover the difference in performance of initial solutions and algorithms, an experimental design is performed and results are reported.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号