首页 | 本学科首页   官方微博 | 高级检索  
     


A special case of transfer lines balancing by graph approach
Affiliation:1. Department of Industrial Engineering, Izmir Democracy University, Izmir, Turkey;2. Department of Industrial Engineering, Gaziantep University, Gaziantep, Turkey;3. Department of Computer Engineering, Munzur University, Tunceli, Turkey
Abstract:A balancing problem for paced production lines with workstations in series and blocks of parallel operations at the workstations is considered. Operations of each workstation are partitioned into blocks. All operations of the same block are performed simultaneously by one spindle head. All blocks of the same workstation are also executed simultaneously. The relations of the necessity of executing some operations at the same workstation, the possibility of combining the blocks at the same workstation as well as precedence constraints are given. The operation time of the workstation is the maximal value among operation times of its blocks. The line cycle time is the maximal workstation time. The problem is to choose blocks from a given set and allocate them to workstations in such a way that (i) all the operations are assigned, (ii) the above constraints are satisfied, (iii) a given cycle time is not exceeded, and (iv) the line cost is minimal. A method for solving the problem is based on its transformation to a constrained shortest path problem.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号