首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Optimization Models for Forest Road Upgrade Planning
Authors:Mathias Henningsson  Jenny Karlsson  Mikael Rönnqvist
Institution:1.Division of Optimization,Link?ping University,Link?ping,Sweden;2.Department of Finance and Management Science,Norwegian School of Economics and Business Administration,Bergen,Norway;3.The Forestry Research Institute of Sweden,Uppsala,Sweden
Abstract:Road blocking due to thawing or heavy rains annually contribute to a considerable loss in Swedish forestry. Companies are forced to build up large stocks of raw material (saw and pulp logs) in order to secure a continuous supply when access to the road network is uncertain. Storage outdoors leads to quality deterioration and monetary losses. Other related costs due to road blocking are road damage and longer haulage distances. One approach to reduce the losses due to road blocks is to upgrade the road network to a standard that guarantees accessibility. We consider the road upgrade problem from the perspective of Swedish forest companies with a planning horizon of about one decade. The objective is to minimize the combined upgrade and transportation costs. We present two mixed integer programming models, which are uncapacitated fixed charge network flow problems including multiple assortments, several time periods and a set of road classes. One model is based on arc flows and one on route flows. For a typical planning instance, the models become large and we propose how to improve solution performance through model strengthening. The models are tested in a case study for a major Swedish forest company.
Keywords:forestry  wood flow  road upgrading  practice of OR  modelling  integer programming  model strengthening
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号