首页 | 本学科首页   官方微博 | 高级检索  
     


A heuristic method for RCPSP with fuzzy activity times
Authors:Tarun Bhaskar  Manabendra N. Pal  Asim K. Pal
Affiliation:1. Computing & Decision Sciences Lab, GE India Technology Centre, Bangalore, India;2. Indian Institute of Management Calcutta, Kolkata 700104, India
Abstract:In this paper, we propose a heuristic method for resource constrained project scheduling problem with fuzzy activity times. This method is based on priority rule for parallel schedule generation scheme. Calculation of critical path in this case requires comparison of fuzzy numbers. Distance based ranking of fuzzy number is used for finding the critical path length and concept of shifting criticality is proposed for some of the special cases. We also propose a measure for finding the non-integer power of a fuzzy number. We discuss some properties of the proposed method. We use an example to illustrate the method.
Keywords:Project scheduling   Time   Critical path   Fuzzy number
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号