Multi-level single machine lot-sizing and scheduling with zero lead times |
| |
Authors: | Hartmut Stadtler |
| |
Affiliation: | Institute for Logistics and Transportation, University of Hamburg, Von-Melle-Park 5, 20146 Hamburg, Germany |
| |
Abstract: | A pharmaceutical company raised the question whether an increased product portfolio could still be manufactured on the existing machinery. The proportional lot-sizing and scheduling problem (PLSP) seemed to be most appropriate to answer this question. However, although there are papers dealing with a multi-level PLSP none allows a zero lead time offset which is a prerequisite for the case considered here. |
| |
Keywords: | Lot-sizing Scheduling PLSP Bill of materials Lead time |