首页 | 本学科首页   官方微博 | 高级检索  
     


An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process
Authors:Chun-Tao Chang and Liang-Yuh Ouyang
Affiliation:Department of Statistics, Tamkang University, Tamsui, Taipei, Taiwan and Department of Management Sciences, Tamkang University, Tamsui, Taipei, Taiwan
Abstract:Some classical studies on economic production quantity (EPQ) models with imperfect production processes have focused on determining the optimal production lot size. However, these models neglect the fact that the total production-inventory costs can be reduced by reworking imperfect items for a relatively small repair and holding cost. To account for the above phenomenon, we take the out of stock and rework into account and establish an EPQ model with imperfect production processes, failure in repair and complete backlogging. Furthermore, we assume that the holding cost of imperfect items is distinguished from that of perfect ones, as well as, the costs of repair, disposal, and shortage are all included in the proposed model. In addition, without taking complex differential calculus to determine the optimal production lot size and backorder level, we employ an arithmetic-geometric mean inequality method to determine the optimal solutions. Finally, numerical examples and sensitivity analysis are analyzed to illustrate the validity of the proposed model. Some managerial insights are obtained from the numerical examples.
Keywords:Production   random defective rate   failure in repair   backlogging   arithmetic-geometric mean inequality.
点击此处可从《Journal of Applied Analysis & Computation》浏览原始摘要信息
点击此处可从《Journal of Applied Analysis & Computation》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号